Parcel: 11520198A

Inspection Status: Partial Pass

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - TD-DEV-0623-00272

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/12/2024 PDSD Engineering Division Pre-Construction SITE Partial Pass Contractor needed a rebar inspection for the footer for trash enclosure
08/13/2024 PDSD Engineering Division Pre-Construction SITE Partial Pass Contractor called in for flat work pouring sidewalk 10’ x 240 lineal feet
08/20/2024 PDSD Engineering Division Pre-Construction SITE Partial Pass Contractor, good to pour 120 lineal feet of 10 foot sidewalk
11/28/2023 PDSD Engineering Division Pre-Construction SITE Partial Pass Michael with Hayden, 480–6 17–5438 lock 0055
Magnum paving . one double trash enclosure. No stormwater piping accessible routes and parking to be installed. Post address. Sw and Stormwater controls have been posted and placed as needed. Barrier fencing installed were needed. Existing trees protected. Temporary fencing installed.