Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 11520198A

Inspection Status: Passed

Inspection History: PDSD Site/Engineering Division - NPPO

Permit Number - TD-DEV-0623-00272

Inspection Description - PDSD Site/Engineering Division - NPPO

Inspection Status - Passed

Date Description Inspector Results Comments
01/15/2025 PDSD Site/Engineering Division - NPPO Passed There is no NPO on this site
11/27/2024 PDSD Site/Engineering Division - NPPO Partial Pass Contractor called in the wrong inspection. Contractor should’ve called in for flat work. Forming for 200 x 10 lineal feet of sidewalk and the Ramada on the southwest side pad.
11/28/2023 PDSD Site/Engineering Division - NPPO Partial Pass trees have been protected in place with barricades