Permit: TD-DEV-0526-00136
Permit Details
Status:
Fees Paid
Type:
Development Package
Address:
2343 E BROADWAY BL
Address NEW:
2343 E BROADWAY BL
Apply Date:
05/29/2026
Applicant:
Kelly Rehm
Description:
The Continental Development Co. Photovoltaic System will consist of 182 640W modules & 3 grid-tied inverters. The system will supply power through an existing TEP service. Modules will be mounted on 2 new steel parking canopies in an existing paved parking area. The new canopies will replace existing parking shades in the same locations. NOTE: PARCELS 125-08-116A & 125-08-1150 HAVE BEEN COMBINED TO 125-08-116B.
Permit Reviews
Permit Number - TD-DEV-0526-00136
Permit Status: Fees paid
Permit Description: The Continental Development Co. Photovoltaic System will consist of 182 640W modules & 3 grid-tied inverters. The system will supply power through an existing TEP service. Modules will be mounted on 2 new steel parking canopies in an existing paved parking area. The new canopies will replace existing parking shades in the same locations.
NOTE: PARCELS 125-08-116A & 125-08-1150 HAVE BEEN COMBINED TO 125-08-116B.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | DEVELOPMENT PACKAGE NEW v.1 | 06/30/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0526-00136
Permit Status: Fees paid
Permit Description: The Continental Development Co. Photovoltaic System will consist of 182 640W modules & 3 grid-tied inverters. The system will supply power through an existing TEP service. Modules will be mounted on 2 new steel parking canopies in an existing paved parking area. The new canopies will replace existing parking shades in the same locations.
NOTE: PARCELS 125-08-116A & 125-08-1150 HAVE BEEN COMBINED TO 125-08-116B.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/08/2026 | Prior to Final: • Deferred Items: The following items are not required for initial DP approval but must be submitted under the Utility Permit as deferred submittals prior to final inspections: o Site electrical distribution o Site lighting systems |