Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0526-00136
Parcel: 12508116B

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0526-00136
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Design Review Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
08/05/2026 Historic REQUIRES RESUBMIT HISTORIC REVIEW REQUIRED: The subject property is a contributing historic property to the Sunshine Mile Historic District, which is listed in the National Register of Historic Places. This property is also located within the Sunshine Mile District (SMD) optional zoning overlay. Historic review is required as the SMD Zoning Option will be utilized for this project. APPLICATION REQUIREMENTS: SMD and Historic Review requires a supplemental application called a Design Package. Please see the Historic & Special Districts Application Instructions for more information about submittal requirements: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/special_districts_application_instructions_3.3.2025.pdf. All materials required as part of your Design Package should be combined into a single PDF. CREATE SUB-RECORD AND SUBMIT DESIGN PACKAGE: Submit your Design Package as a single PDF by uploading it to the Special District Sub-Record for UOD review (See “How to Create a Sub-Record”: https://tucsonpdsd.info/TDCOnlineHistoricSubRecord). NEXT STEPS IN REVIEW PROCESS: Your Design Package will be reviewed by staff. Once the package is deemed complete and fees are paid, staff will schedule a Full Review with the Tucson-Pima County Historical Commission, Plans Review Subcommittee (PRS). **To expedite your review, please notify your assigned Historic Preservation Planner via email once fees are paid.** Following PRS review, comments will be forwarded to the PDSD Director, who makes a final decision. Conditions of approval are common and revisions to the Design Package will be required before final Historic approval is granted. QUESTIONS: For questions or to set up a meeting with Historic staff, please contact: Michael.Taku@tucsonaz.gov.
07/30/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
To Whom it May Concern,
Tucson Electric Power Company (TEP) has received notification that you, or someone on
your behalf, has submitted an application for a development permit to the City of Tucson.
In accordance with Arizona state law and TEP’s Rules and Regulations on file with the
Arizona Corporation Commission, it is the developer’s responsibility to be aware of the
location of all existing TEP facilities located at and near the project site. Any grade changes,
drainage modifications, or other site improvements may require relocation or modification
of existing TEP facilities. All costs associated with the relocation or modification of TEP
facilities are the responsibility of the developer. Therefore, while the issuance of a
development permit by the City of Tucson may authorize your development of the site, it
does not authorize any site improvements or construction activities that may require
relocation or modification of TEP facilities without coordinating the work and cost
responsibility with TEP.
TEP is available to assist with coordination and project preparation. Prior to starting any
development activities, please contact us by filling out a General Inquiry Form at:
https://apps.tep.com/CustomerForms/Construction/GeneralInquiry or by calling Design
Services at (520) 918-8300 option 3 who can help identify and mitigate conflicts with TEP’s
existing facilities and easements. Please note that this will require a PDF version of the final
set of plans, including approved site plans, electric load information, paving, off-site
improvements, and irrigation plans, however, conflict identification and mitigation planning
can begin sooner. You are also responsible for obtaining a survey by a registered surveyor to
identify existing easements that may be in conflict with your planned project. If additional
or modified easements are required, they must be documented by a separate instrument.
Should you have any easement questions, please contact our Land Resources Department
at LandReviews@tep.com.
Sincerely,
Tucson Electric Power
Electric Service Requirements: https://www.tep.com/electric-service-requirements/
Rules and Regulations: https://www.tep.com/rates/#rules