Permit Details

Status:
Inspections Complete
Type:
Development Package
Address:
7101 E 22ND ST
Address NEW:
7101 E 22ND ST
Apply Date:
05/15/2025
Applicant:
Blake Junak
Description:
DP for new restaurant with drive thru

Permit Reviews

Permit Number - TD-DEV-0525-00137
Permit Status: Inspections complete
Permit Description: DP for new restaurant with drive thru
Start Date Submittal Complete Date Status  
07/14/2025 DEVELOPMENT PACKAGE NEW v.2 08/11/2025 APPROVED Review Details
05/15/2025 DEVELOPMENT PACKAGE NEW v.1 06/30/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0525-00137
Permit Status: Inspections complete
Permit Description: DP for new restaurant with drive thru
Total Outstanding Activity Conditions - 1
Date Name
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0525-00137
Permite Description: DP for new restaurant with drive thru
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/16/2025 ENGR Engineering Final N/A Not Ready Items pending for Engineering Final: Bicycle parking installation, light pole installation, loosen tree ties, pedestrian ramp handrail installation, refuse enclosure latches and hold-open holes. Construction fence will remain for T.I. work. Recall Engineering Final when all work is complete.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0525-00137
Permit Description: DP for new restaurant with drive thru
Total Completed Inspections - 7
Date Description Inspector Results Comments
08/14/2025 PDSD Engineering Division Pre-Construction SITE Passed Met with Brandy Burke with MW Morrissey on-site. Scope of project was discussed as well as inspection expectations; pertinent inspections will be added to the development package.
12/16/2025 Passed Site striping is complete. Pedestrian circulation is correct. Handrail on ramp and bike parking will be confirmed during Engineering Final Inspection.
12/16/2025 Passed Sidewalks and flatwork is complete. Remaining section in drive-through will be finished durning tenant improvement work.
12/16/2025 Final inspection to ensure all landscape and water harvesting SITE Passed Water harvesting areas are correct.
12/16/2025 LAND Landscape Appearance & Function Final Passed Final touches being completed. Trees need loose ties, ground cover rock needs finished. Completion will be confirmed at Engineering Final Inspection.
12/16/2025 For trash and recycling enclosures Passed Refuse enclosure is complete, final function (latches) will be confirmed during Engineering Final Inspection.
02/03/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Shell building only, construction fence to remain, not ready for public access.

Documents

File Name Document Type  
1_25-029 GEOTECH REPORT - CHIPOTLE, BRAMIC DESIGN GROUP_V1.PDF DOCUMENTS VIEW
1_T5648_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
2_NPPO EXCEPTION APP_V1.PDF DOCUMENTS VIEW
APPROVED - 2_PLAN SET - CHIPOTLE 22ND - KOLB - 5648_DP_V2 - STAMPED 08.11.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MARK UP MAP.PDF DOCUMENTS VIEW
PAGES FROM 1_5648_DP_V1 (1).PDF DOCUMENTS VIEW
RESPONSE LETTER (6).PDF DOCUMENTS VIEW