Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2025 | Passed | Site striping is complete. Pedestrian circulation is correct. Handrail on ramp and bike parking will be confirmed during Engineering Final Inspection. |