Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0525-00137

Parcel: 134162140


Addresses:

7101 E 22ND ST

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
08/14/2025 PDSD Engineering Division Pre-Construction SITE Passed Met with Brandy Burke with MW Morrissey on-site. Scope of project was discussed as well as inspection expectations; pertinent inspections will be added to the development package.