Description:
New 2-story, 8-unit apartment building

Permit Reviews

Permit Number - TD-DEV-0523-00250
Permit Status: Inspections
Permit Description: New 2-story, 8-unit apartment building
Start Date Submittal Complete Date Status  
09/11/2023 DEVELOPMENT PACKAGE NEW v.2 11/06/2023 APPROVED Review Details
05/22/2023 DEVELOPMENT PACKAGE NEW v.1 07/14/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0523-00250
Permite Description: New 2-story, 8-unit apartment building
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/02/2025 SITE - Stormwater Setup and Controls N/A Complete (Recurring) The track out rock has been installed. They cut in a 1 foot trench for the stormwater. SWPPP.
09/16/2025 N/A Partial Pass 9/16/25 Footer goes along west side of site from south of the driveway continuing north to refuse enclosures and then to the north east corner and turns the corner over to the building. Footer correct to building plans. Campaction reinforcing and dimensions are correct. This section of wall footer is OK to pour.
Build wall to plan in two lifts and call us out for a pre-grout inspection when done with first lift. Also call us out to look at any other site wall footers.
09/16/2025 N/A Partial Pass 9/16/25
Site is surveyed and stakes and nails are correct to plan. Curbs are in in parking lot and layed out correct to survey. Lot is rough, grade break is in but grading for paving will not start until sometime in October.

Fix the Trackout at the exit. Dirt is leaving the site. Clean the road up.
09/16/2025 For trash and recycling enclosures N/A Partial Pass 9/16/25
Slabs okay to pour. Slope is correct. Compaction test done. Reinforcing correct. Correct to survey.

9/16/25
Horizontal reinforcing needed 16” oc in wall. Put it in and build the wall up another 2 courses before pre grout inspection on 1st lift.
11/13/2025 N/A Partial Pass 11/13/25
Sidewalk forms and curb ramp at West side and East side of building. Landings, cross slope and running slope are good. There is a PAG Type 1 scupper at west side down spout. Where is the roof drain on east side of building water? Has this been revised or as built will be provided?
11/10/2025 ENGR Paving N/A Partial Pass Sub-grade slopes, compaction, and depths are good, okay to place AB.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0523-00250
Permit Description: New 2-story, 8-unit apartment building
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/21/2025 PDSD Engineering Division Pre-Construction SITE Passed informed the contractor that he has to test all materials need to put in the track out rock wattles on the north end or v ditch
11/25/2025 ENGR Grading Final Passed Site grading is complete in accordance with approved plans. All slopes and drainage are in compliance with design.

Documents

File Name Document Type  
1_DRAINAGE STATEMENT - 3820 E FT LOWELL - 2023-05-19_V1.PDF DOCUMENTS VIEW
APPROVED_2_PLAN SET - 3820 EAST FORT LOWELL - DP - 2023-09-06_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT LETTER-MERGE.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT - 3820 E FT LOWELL - 2023-05-19_V1.PDF DOCUMENTS VIEW
1_TYPE II CAPACITY RESPONSE - 3820 EAST FORT LOWELL - 2023-03-16_V1.PDF DOCUMENTS VIEW
1_TYPE II CAPACITY RESPONSE - 3820 EAST FORT LOWELL - 2023-03-16_V1.PDF PLANS UNDER REVIEW VIEW
1_PLAN SET - 3820 EAST FORT LOWELL - DP - 2023-05-22_V1.PDF PLANS UNDER REVIEW VIEW
1_PDMR PACKAGE_V1.PDF PLANS UNDER REVIEW VIEW
1_DRAINAGE STATEMENT - 3820 E FT LOWELL - 2023-05-19_V1.PDF PLANS UNDER REVIEW VIEW