Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0523-00250
Permit Details
Status:
Inspections
Type:
Development Package
Address:
3820 E FORT LOWELL RD
Address NEW:
3820 E FORT LOWELL RD
Apply Date:
05/22/2023
Applicant:
Blake Junak
Description:
New 2-story, 8-unit apartment building
Permit Reviews
Permit Number - TD-DEV-0523-00250
Permit Status: Inspections
Permit Description: New 2-story, 8-unit apartment building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/11/2023 | DEVELOPMENT PACKAGE NEW v.2 | 11/06/2023 | APPROVED |
| 05/22/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/14/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0523-00250
Permite Description: New 2-story, 8-unit apartment building
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | The track out rock has been installed. They cut in a 1 foot trench for the stormwater. SWPPP. |
| 09/16/2025 | N/A | Partial Pass | 9/16/25 Footer goes along west side of site from south of the driveway continuing north to refuse enclosures and then to the north east corner and turns the corner over to the building. Footer correct to building plans. Campaction reinforcing and dimensions are correct. This section of wall footer is OK to pour. Build wall to plan in two lifts and call us out for a pre-grout inspection when done with first lift. Also call us out to look at any other site wall footers. |
|
| 09/16/2025 | N/A | Partial Pass | 9/16/25 Site is surveyed and stakes and nails are correct to plan. Curbs are in in parking lot and layed out correct to survey. Lot is rough, grade break is in but grading for paving will not start until sometime in October. Fix the Trackout at the exit. Dirt is leaving the site. Clean the road up. |
|
| 09/16/2025 | For trash and recycling enclosures | N/A | Partial Pass | 9/16/25 Slabs okay to pour. Slope is correct. Compaction test done. Reinforcing correct. Correct to survey. 9/16/25 Horizontal reinforcing needed 16” oc in wall. Put it in and build the wall up another 2 courses before pre grout inspection on 1st lift. |
| 11/13/2025 | N/A | Partial Pass | 11/13/25 Sidewalk forms and curb ramp at West side and East side of building. Landings, cross slope and running slope are good. There is a PAG Type 1 scupper at west side down spout. Where is the roof drain on east side of building water? Has this been revised or as built will be provided? |
|
| 11/10/2025 | ENGR Paving | N/A | Partial Pass | Sub-grade slopes, compaction, and depths are good, okay to place AB. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0523-00250
Permit Description: New 2-story, 8-unit apartment building
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | informed the contractor that he has to test all materials need to put in the track out rock wattles on the north end or v ditch | |
| 11/25/2025 | ENGR Grading Final | Passed | Site grading is complete in accordance with approved plans. All slopes and drainage are in compliance with design. |