Inspection Status: Partial Pass

Inspection History

Permit Number - TD-DEV-0523-00250

Inspection Description -

Inspection Status - Partial Pass

Date Description Inspector Results Comments
06/02/2025 Partial Pass Contractors looking for the sewer line on the north end of the project has the stockpile spoils around the hole that they dug
06/18/2025 Partial Pass Contract is good to backfill the sewer line north end of the property
07/02/2025 Not Ready Contractor out on site called him on the phone and he’s going to reschedule for tomorrow
07/14/2025 Partial Pass contractor is installing the rebar for the outside walls not quite ready yet for inspection. The grading is a partial pass.
09/16/2025 Partial Pass 9/16/25
Site is surveyed and stakes and nails are correct to plan. Curbs are in in parking lot and layed out correct to survey. Lot is rough, grade break is in but grading for paving will not start until sometime in October.

Fix the Trackout at the exit. Dirt is leaving the site. Clean the road up.