Status:
Inspections Complete
Type:
Development Package
Address:
1145 S WARREN AV
Address NEW:
1145 S WARREN AV
Apply Date:
05/18/2023
Applicant:
JR Durazo
Description:
Development of new commercial soccer facility with parking and landscaping.

Permit Reviews

Permit Number - TD-DEV-0523-00248
Permit Status: Inspections complete
Permit Description: Development of new commercial soccer facility with parking and landscaping.
Start Date Submittal Complete Date Status  
05/19/2023 DEVELOPMENT PACKAGE NEW v.1 08/11/2023 REQUIRES RESUBMIT Review Details
04/16/2024 DEVELOPMENT PACKAGE NEW v.4 05/03/2024 APPROVED Review Details
02/28/2024 DEVELOPMENT PACKAGE NEW v.3 04/02/2024 REQUIRES RESUBMIT Review Details
11/08/2023 DEVELOPMENT PACKAGE NEW v.2 12/11/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0523-00248
Permit Status: Inspections complete
Permit Description: Development of new commercial soccer facility with parking and landscaping.
Total Outstanding Activity Conditions - 1
Date Name
09/17/2025 Prior to final - needs review for requests for information, AS-Built will need to be submitted

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0523-00248
Permite Description: Development of new commercial soccer facility with parking and landscaping.
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
09/25/2024 PDSD Site/Engineering Division - NPPO N/A Not Ready Not ready for inspection, trees should have been moved by now into,their temporary area.
10/28/2024 SITE - Stormwater Setup and Controls N/A Not Ready Site closed. no activity
10/28/2024 N/A Not Ready Site closed. no activity
11/13/2024 ENGR - Drainage Structures N/A Canceled 1st row of pipe to the east, trench passed 11/13/24.
11/13/2024 Consultation SITE N/A Canceled
04/08/2025 N/A Canceled
04/08/2025 For trash and recycling enclosures N/A Partial Pass Okay to pour bollard
11/15/2024 N/A Canceled
07/25/2025 N/A Partial Pass Pipe is correct, valves are functional, wiring is in place, emitters are good. Okay to backfill.
07/25/2025 N/A Partial Pass Forms including curb ramp leading to ADA parking are set correctly, compaction is 99.5%. Good to pour.
10/09/2024 ENGR Grading Final N/A Not Ready Contractor continues to cut the grade not ready for final

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0523-00248
Permit Description: Development of new commercial soccer facility with parking and landscaping.
Total Completed Inspections - 8
Date Description Inspector Results Comments
10/15/2024 PDSD Engineering Division Pre-Construction SITE Passed
11/06/2024 SITE - Stormwater Follow-up Passed
11/06/2024 Passed
03/21/2025 Consultation SITE Passed Consultation was on the bollards and mat for the refuse enclosure. Engineer on record is going to have to certify that the footing was done per spec.
08/15/2025 Grading Progress ENGR Passed Grading is completed, schedule your grading final and a paving inspection for Monday
08/29/2025 ENGR Paving Passed Compaction was at 98 to 99% and material has passed a proof roll.
08/29/2025 ENGR Grading Final Passed
09/12/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPROVED FOOTY PARK DP PLANS_4TH SUBMITTAL_V4.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED FOOTY PARK DP PLANS_4TH SUBMITTAL_V4.PDF DOCUMENTS VIEW