Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 1145 S WARREN AV
Search
Parcel Attributes
| Parcel | 12908004B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1, R-2, C-3 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Millville |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1145 S WARREN AV
Date - 12/08/2025 5:04 p.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| 3/4 Mile East To Campbell Avenue | 486 |
Permits
Address: 1145 S WARREN AV
Date - 12/08/2025 5:04 p.m.
Total Number Of Permits - (20)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TD-DEV-1124-00313 | Awaiting Submittal | 11/21/2024 | N/A | Development Package | Stockpile Request / Permit for 1600 cu yds | |
| TR-ROW-1124-01314 | Complete | 11/07/2024 | 02/12/2025 | Right-of-Way (ROW) | Trench 35’L X2’W X4’D/ 25’ in asphalt. To install the water line. Work hours 5pm -5am.*** Related permit #TR-ROW-1024-01280 | |
| TR-ROW-1024-01280 | Complete | 10/31/2024 | 01/06/2025 | Right-of-Way (ROW) | 2 Trenches 35’L X2’W X4’D/ 25’ in asphalt. To install electric line. Work hours 5pm -5am.*** (Request Approved For Electrical Installation Only, Separate permit required for Water Line Installation) | |
| TC-COM-0924-01879 | Complete | 09/27/2024 | 03/16/2026 | Commercial Building | Development of new commercial soccer facility with parking and landscaping. | |
| TC-CFO-0925-00135 | Denied | 09/16/2025 | N/A | Certificate of Occupancy | This project will not receive a Temporary Certificate of Occupancy (TCO) once everything is completed you will receive a Letter of Completion. Once all conditions are satisfied please re-request L of C/C of O. Any questions please contact building_official@tucsonaz.gov Development of new commercial soccer facility with parking and landscaping. | |
| TR-UTL-0825-01258 | Complete | 08/05/2025 | 10/17/2025 | Right-of-Way (ROW) - Utility | WO T148137 - XFMR INSTALL & LINE EXT. FOR FOOTY PARK | |
| TR-ROW-0725-00930 | Complete | 07/22/2025 | 09/26/2025 | Right-of-Way (ROW) | **Continuation permit TR-ROW-0425-00519** Electrical Work Trench 35’L X2’W X4’D/ 25’ in asphalt. | |
| TR-ROW-0725-00931 | Complete | 07/22/2025 | 09/26/2025 | Right-of-Way (ROW) | **Continuation permit TR-ROW-0425-00520 ** Sewer Work- Trench 40’L X 6’D X 4’W. | |
| TD-DEV-0523-00248 | Inspections Complete | 05/18/2023 | 09/11/2028 | Development Package | Development of new commercial soccer facility with parking and landscaping. | |
| TR-ROW-0425-00518 | Inspections | 04/16/2025 | 07/28/2025 | Right-of-Way (ROW) | Renew in 60 days as of 05/29/2025 new expiration date 07/28/2025 Water line work Trench 35’L X2’W X4’D/ 25’ in asphalt.*** | |
| TR-ROW-0425-00519 | Inspections | 04/16/2025 | 07/28/2025 | Right-of-Way (ROW) | Electrical Work Trench 35’L X2’W X4’D/ 25’ in asphalt.*** Renew in 60 days as of 05/29/2025 new expiration date 07/28/2025 | |
| TR-ROW-0425-00520 | Inspections | 04/16/2025 | 07/28/2025 | Right-of-Way (ROW) | Renew in 60 days as of 05/29/2025 new expiration date 07/28/2025 Sewer Work Trench 40’L X 6’D X 4’W. *** | |
| TR-ROW-0325-00296 | Issued | 03/03/2025 | 06/17/2025 | Right-of-Way (ROW) | Install 2 standard drive ways.*** | |
| T16BU01010 | WITHDRWN | 07/02/2016 | N/A | DEMO | TOTAL DEMO PLUS ALL AUXILIARY STRUCTURES | |
| T16BU01385 | FINAL | 11/30/2016 | 09/17/2017 | DEMO | TOTAL DEMOLITION | |
| T16EX01112 | FINAL | 04/04/2016 | 06/04/2016 | EXCAV | GEOTECHNICAL BORING INVESTIGATION FOR 5 LOCATIONS TO DRILL A 6-INCH BORING (VERTICAL) TO A DEPTH OF 10-FEET BELOW GROUND SURFACE TO OBTAIN A SOIL SAMPLE TO BE USED FOR CORROSION TESTING. | |
| T16RW02129 | FINAL | 10/20/2016 | 11/19/2016 | ROW | (2) 5x5 BELLHOLES IN DIRT ON WEST SIDE OF PROPERTY BEHIND CURB ON WARREN - TO ABANDON GAS LINE | |
| T16TC00812 | EXPIRED | 04/04/2016 | N/A | BARRICAD | GEOTECHNICAL BORING INVESTIGATION FOR 5 LOCATIONS TO DRILL A 6-INCH BORING (VERTICAL) TO A DEPTH OF 10-FEET BELOW GROUND SURFACE TO OBTAIN A SOIL SAMPLE TO BE USED FOR CORROSION TESTING. | |
| T17RW00860 | FINAL | 02/21/2017 | 03/26/2017 | ROW | EXCAVATE TO ABANDON FIRE SERVICE IN ASPHALT. WILL REQUIRE HARD CLOSURE OF S WARREN AVE. | |
| T17RW01461 | FINAL | 04/03/2017 | 05/05/2017 | ROW | 10 LF IN FRONT OF POSTED ADDRESS IN ASPHALT FOR PERMANET PATCH |
Plans
Address: 1145 S WARREN AV
Date - 12/08/2025 5:04 p.m.
Total Number Of Plans - (2)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TE-BAS-1123-00216 | Approved | 11/22/2023 | N/A | -- Commercial Water Harvesting Ordinance | Development of new commercial soccer facility with parking and landscaping. | |
| T21PRE0067 | CLOSED | 03/19/2021 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Site/Grading/Swppp/Floodplain - Footy Park. |
Record Requests
Address: 1145 S WARREN AV
Date - 12/08/2025 5:04 p.m.
Total Number Of Requests - (9)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0125-00124 | Denied | 01/07/2025 | 01/07/2025 | Requests | DENIED – DUE TO NO PRE-ACTIVITY MEETING SCHEDULED VIA THE ONLINE PORTAL. Trench 35’L X2’W X4’D/ 25’ in asphalt. To install the water line. Work hours 5pm -5am.*** Related permit #TR-ROW-1024-01280 ** RENEW 30 DAYS |
| REQ-0125-00260 | Approved | 01/13/2025 | 01/13/2025 | Requests | Trench 35’L X2’W X4’D/ 25’ in asphalt. To install the water line. Work hours 5pm -5am.*** Related permit #TR-ROW-1024-01280** RENEW 30 DAYS , INSPECTOR ADDED PREACTIVITY MEETING |
| REQ-0425-02585 | Approved | 04/16/2025 | 04/16/2025 | Requests | Install 2 standard drive ways.*** RENEW 60 DAYS |
| REQ-0625-03740 | Approved | 06/03/2025 | 06/03/2025 | Requests | Renew in 30 days as of 05/29/2025 new expiration date 07/28/2025 Electrical Work Trench 35’L X2’W X4’D/ 25’ in asphalt.*** RENEW 60 DAYS |
| REQ-0625-03741 | Approved | 06/03/2025 | 06/04/2025 | Requests | Renew in 60 days as of 05/29/2025 new expiration date 07/28/2025 Water line work Trench 35’L X2’W X4’D/ 25’ in asphalt.*** RENEW 60 DAYS |
| REQ-0625-03742 | Approved | 06/03/2025 | 06/04/2025 | Requests | Renew in 60 days as of 05/29/2025 new expiration date 07/28/2025 Sewer Work Trench 40’L X 6’D X 4’W. *** RENEW 60 DAYS |
| REQ-0724-05148 | Complete | 07/26/2024 | 07/30/2024 | Requests | *NO BUILDING PERMIT RECORDS AVAILABLE.FOR NEWER/CURRENT INFORMATION PLEASE CHECK PROPERTY RESEARCH ONLINE (https://pro.tucsonaz.gov/).* - plan records |
| REQ-0925-05714 | Denied | 09/16/2025 | N/A | Requests | Request has been Denied. Outdoor Lighting condition still remains to be satisfied, please request CofO once all conditions have been satisfied. Note, in order to satisfy this condition, we require a stamped Special Inspections Certificate (SIC) along with a report or letter stamped by a registered Engineer. This report should include an inspection confirming compliance or a letter explaining that the inspection was not conducted for this project. For any questions, please contact: Building_Official@tucsonaz.gov Development of new commercial soccer facility with parking and landscaping. |
| REQ-0925-05755 | Denied | 09/17/2025 | N/A | Requests | This project is not complete, current/active deferred submittal review must be approved, all conditions need to be satisfied and related development package permit needs to be in completed status (TD-DEV-0523-00248). Please re-request once all reviews are approved, all conditions have been satisfied and related permits are in complete status. -Development of new commercial soccer facility with parking and landscaping. |