Inspection History Details
Inspection Status: Canceled
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2024 | ENGR - Drainage Structures | Canceled | ||
| 11/13/2024 | ENGR - Drainage Structures | Canceled | 1st row of pipe to the east, trench passed 11/13/24. |