Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
5655 E 29TH ST
Address NEW:
5655 E 29TH ST
Apply Date:
04/25/2025
Applicant:
David Evans
Description:
development package for 5655 E 29th. Residential

Permit Reviews

Permit Number - TD-DEV-0425-00125
Permit Status: Complete
Permit Description: development package for 5655 E 29th. Residential
Start Date Submittal Complete Date Status  
04/25/2025 DEVELOPMENT PACKAGE NEW v.1 05/28/2025 REQUIRES RESUBMIT Review Details
09/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/24/2025 APPROVED Review Details
06/06/2025 DEVELOPMENT PACKAGE NEW v.1 07/02/2025 REQUIRES RESUBMIT Review Details
08/14/2025 DEVELOPMENT PACKAGE NEW v.3 09/09/2025 REQUIRES RESUBMIT Review Details
07/11/2025 DEVELOPMENT PACKAGE NEW v.2 08/08/2025 REQUIRES RESUBMIT Review Details
09/09/2025 DEVELOPMENT PACKAGE NEW v.4 09/15/2025 APPROVED Review Details
02/13/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/13/2026 APPROVED Review Details

Conditions

Permit Number - TD-DEV-0425-00125
Permit Status: Complete
Permit Description: development package for 5655 E 29th. Residential
Date Description Comments
09/09/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0425-00125
Permite Description: development package for 5655 E 29th. Residential
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/23/2025 PDSD Engineering Division Pre-Construction SITE N/A Re-inspection required (with fee)
04/15/2026 ENGR Engineering Final N/A Re-inspection required (with fee) Missing ADA signs. Will need to recall inspection.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0425-00125
Permit Description: development package for 5655 E 29th. Residential
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/17/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.

Documents

File Name Document Type  
2_NPP APPLICATION FOR EXCEPTION_V1.PDF DOCUMENTS VIEW
3_DRAINAGE REPORT FOR 5655 EAST 29TH ST_V1.PDF DOCUMENTS VIEW
4_WATER HARVESTING PLAN_V1.PDF DOCUMENTS VIEW
AD-HOC_WRUNSET_DN-00-DS_21124.PDF DOCUMENTS VIEW
APPROVED - 29TH FINAL_V2- STAMPED 09.15.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PAGES FROM 1_DEVELOPMENT PACKAGE FOR 5655 EAST 29TH ST._V1 (1).PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
AD-HOC_WRUNSET_DN-00-DS_21124.PDF DOCUMENTS VIEW
PAGES FROM 1_DEVELOPMENT PACKAGE FOR 5655 EAST 29TH ST._V1 (1).PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW