Status:
Inspections Complete
Type:
Development Package
Address NEW:
3105 N CAMPBELL AV
Apply Date:
04/14/2025
Applicant:
Description:
New building for Restaurant/Retail with various suites

Permit Reviews

Permit Number - TD-DEV-0425-00116
Permit Status: Inspections complete
Permit Description: New building for Restaurant/Retail with various suites
Start Date Submittal Complete Date Status  
08/05/2025 DEVELOPMENT PACKAGE NEW v.2 08/29/2025 APPROVED Review Details
12/02/2025 AS-BUILT v.1 12/10/2025 APPROVED Review Details
07/29/2025 DEVELOPMENT PACKAGE NEW v.1 07/29/2025 IN REVIEW Review Details
07/22/2025 DEVELOPMENT PACKAGE NEW v.2 07/29/2025 APPROVED Review Details
04/16/2025 DEVELOPMENT PACKAGE NEW v.1 06/04/2025 IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0425-00116
Permit Status: Inspections complete
Permit Description: New building for Restaurant/Retail with various suites
Total Outstanding Activity Conditions - 1
Date Name
08/29/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0425-00116
Permite Description: New building for Restaurant/Retail with various suites
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/30/2025 PDSD Engineering Division Pre-Construction SITE N/A Deferred 9/30/25
Discussed NPPO That inspection is complete if needed.

Trackout needs to be installed.
Address and Name on Fence.

Inspections needed:
Grading, Refuse Enclosure,Flatwork, Paving and Landscaping.
Discussed compaction tests.
11/24/2025 For trash and recycling enclosures N/A Partial Pass Okay to pour both refuse enclosure slab and approach.
12/18/2025 N/A Not Ready Sidewalk ready for inspection is ROW

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0425-00116
Permit Description: New building for Restaurant/Retail with various suites
Total Completed Inspections - 12
Date Description Inspector Results Comments
09/30/2025 NPPO Final Passed
03/19/2026 For trash and recycling enclosures Passed Refuse enclosures are complete in accordance with approved plans.
03/19/2026 LAND Landscape Appearance & Function Final Passed 3/19/26 - Landscape is complete in accordance with approved plans. Plants, irrigation, ground cover, and water harvesting are good.
03/19/2026 ENGR Paving Passed Paving placement, slopes, and reveals are in accordance with approved plans.
03/19/2026 Passed Sidewalks and flatwork is complete in accordance to approved plans.
03/20/2026 Consultation SITE Passed Retaining wall at NW needs an engineer approved detail added to the Development Package to ensure structural integrity.
04/02/2026 ENGR Engineering Final Passed Site is complete in accordance with approved development package.
04/02/2026 SITE - Zoning Final Passed
04/02/2026 Final inspection to ensure all landscape and water harvesting SITE Passed
04/02/2026 Passed All items related to striping and parking are complete in accordance with approved plans.
04/02/2026 ENGR - Drainage Structures Passed
04/02/2026 Passed