Inspection History Details
Inspection Status: Deferred
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2025 | PDSD Engineering Division Pre-Construction SITE | Deferred | 9/30/25 Discussed NPPO That inspection is complete if needed. Trackout needs to be installed. Address and Name on Fence. Inspections needed: Grading, Refuse Enclosure,Flatwork, Paving and Landscaping. Discussed compaction tests. |