Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0425-00116
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2025 | For trash and recycling enclosures | Partial Pass | 11/7/25 Footers for 2 single attached Refuse Enclosures. Send pictures of loose material removed and all rebar 3" clear of dirt prior to concrete placement. Footer dimensions correct. Two bars at wall ends and three in the corners. #4 rebar reinforcing correct. Verts at 24" for stack bond. Request pre-grout inspection when ready with 1st lift built or at 6 ft with bond beam and weep holes. Use correct horizontal reinforcement. |
|
| 11/13/2025 | For trash and recycling enclosures | Partial Pass | 11/13/25 RE walls built to 6' with bond beam. Okay to pour grout. Fill all cells w/ verts and cover bond beam w/ 2" grout. Send picture of grout inspection weep holes. Request inspection when bollard footers and or mat for floor ready. Submit compaction report to the portal. |
|
| 11/24/2025 | For trash and recycling enclosures | Partial Pass | Okay to pour both refuse enclosure slab and approach. |