New building with parking and landscaping improvements

Permit Reviews

Permit Number - TD-DEV-0423-00204
Permit Status: Complete
Permit Description: New building with parking and landscaping improvements
Start Date Submittal Complete Date Status  
06/20/2023 DEVELOPMENT PACKAGE NEW v.1 07/19/2023 REQUIRES RESUBMIT Review Details
05/06/2026 AS-BUILT v.1 05/14/2026 APPROVED Review Details
04/11/2023 DEVELOPMENT PACKAGE REVIEW v.1 05/25/2023 REQUIRES RESUBMIT Review Details
07/19/2023 DEVELOPMENT PACKAGE NEW v.2 12/28/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0423-00204
Permite Description: New building with parking and landscaping improvements
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/08/2024 PDSD Engineering Division Pre-Construction SITE N/A Partial Pass
02/03/2026 COT - BASN - Drainage/Basin - Condition Inspection N/A Partial Pass Contractor is forming WHIA basins for each of these units and they are good in layout and slope. I’m going over the depth so they are 6 to 9 inches below the curb outlets per plan but they look good to start.
12/24/2025 For trash and recycling enclosures N/A Partial Pass contractors good to grout the first 4 feet of the trash enclosures

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0423-00204
Permit Description: New building with parking and landscaping improvements
Total Completed Inspections - 8
Date Description Inspector Results Comments
01/16/2024 SITE - Stormwater Setup and Controls Passed all the wattles are in place and the track-out rock in place.
01/12/2026 Passed 01/16/25
Benchmarks are marked on fence post for each site at Camino de Café. Each address was surveyed and rough graded to survey and plan.
Parking area and PAAL are rough cut grade hubs were placed for grading but PAAL and parking area will be rolled and finished before density testing and blue tops are placed on subgrade. Basins are not cut/complete yet from each building down to Camino Café and then in the front along Camino Café. patients can be checked at intermediate or gading final final.
02/03/2026 Passed Scupper walls will be doweled because they are a cold joint. Okay to pour scupper and last panel pending picture of dowels.
04/07/2026 ENGR Paving Passed
04/07/2026 Passed
04/09/2026 For trash and recycling enclosures Passed
04/20/2026 ENGR Engineering Final Passed
04/20/2026 Final inspection to ensure all landscape and water harvesting SITE Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
TD-DEV-0423-00204 - AS-BUILT_V1.PDF DOCUMENTS VIEW
TD-DEV-0423-00204 - DP LOT 8 AS-BUILT LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_TD-DEV-0423-00204 - DP SET_V3.PDF DOCUMENTS VIEW
1_ LOT 8 NPPO EXCEPTION SET_V1.PDF DOCUMENTS VIEW
1_BROWN-RITA LOTS 8-12_ DRAINAGE REPORT_V1.PDF DOCUMENTS VIEW
UNAPPROVED DEVELOPMENT LETTER - COPY.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW
1_BROWN-RITA LOTS 8-12_ DRAINAGE REPORT_V1.PDF PLANS UNDER REVIEW VIEW
1_BROWN-RITA LOT 8_ DP_PLAN_V1.PDF PLANS UNDER REVIEW VIEW
1_ LOT 8 NPPO EXCEPTION SET_V1.PDF PLANS UNDER REVIEW VIEW