Permit: TD-DEV-0423-00204
Permit Details
Status:
Complete
Type:
Development Package
Address:
8219 S CAMINO DE CAFE
Address NEW:
8219 S CAMINO DE CAFE
Apply Date:
04/10/2023
Applicant:
Chris Guinter
Description:
New building with parking and landscaping improvements
Permit Reviews
Permit Number - TD-DEV-0423-00204
Permit Status: Complete
Permit Description: New building with parking and landscaping improvements
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/19/2023 | REQUIRES RESUBMIT |
| 05/06/2026 | AS-BUILT v.1 | 05/14/2026 | APPROVED |
| 04/11/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/25/2023 | REQUIRES RESUBMIT |
| 07/19/2023 | DEVELOPMENT PACKAGE NEW v.2 | 12/28/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0423-00204
Permite Description: New building with parking and landscaping improvements
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | |
| 02/03/2026 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Partial Pass | Contractor is forming WHIA basins for each of these units and they are good in layout and slope. I’m going over the depth so they are 6 to 9 inches below the curb outlets per plan but they look good to start. |
| 12/24/2025 | For trash and recycling enclosures | N/A | Partial Pass | contractors good to grout the first 4 feet of the trash enclosures |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0423-00204
Permit Description: New building with parking and landscaping improvements
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2024 | SITE - Stormwater Setup and Controls | Passed | all the wattles are in place and the track-out rock in place. | |
| 01/12/2026 | Passed | 01/16/25 Benchmarks are marked on fence post for each site at Camino de Café. Each address was surveyed and rough graded to survey and plan. Parking area and PAAL are rough cut grade hubs were placed for grading but PAAL and parking area will be rolled and finished before density testing and blue tops are placed on subgrade. Basins are not cut/complete yet from each building down to Camino Café and then in the front along Camino Café. patients can be checked at intermediate or gading final final. |
||
| 02/03/2026 | Passed | Scupper walls will be doweled because they are a cold joint. Okay to pour scupper and last panel pending picture of dowels. | ||
| 04/07/2026 | ENGR Paving | Passed | ||
| 04/07/2026 | Passed | |||
| 04/09/2026 | For trash and recycling enclosures | Passed | ||
| 04/20/2026 | ENGR Engineering Final | Passed | ||
| 04/20/2026 | Final inspection to ensure all landscape and water harvesting SITE | Passed |