Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History

Date Description Inspector Results Comments
01/12/2026 Passed 01/16/25
Benchmarks are marked on fence post for each site at Camino de Café. Each address was surveyed and rough graded to survey and plan.
Parking area and PAAL are rough cut grade hubs were placed for grading but PAAL and parking area will be rolled and finished before density testing and blue tops are placed on subgrade. Basins are not cut/complete yet from each building down to Camino Café and then in the front along Camino Café. patients can be checked at intermediate or gading final final.