Permit Details

Status:
Inspections
Type:
Development Package
Address NEW:
10080 E OLD VAIL RD
Apply Date:
03/10/2025
Applicant:
Anthony Boone
Description:
Dental Office, 4,292 SF

Permit Reviews

Permit Number - TD-DEV-0325-00077
Permit Status: Inspections
Permit Description: Dental Office, 4,292 SF
Start Date Submittal Complete Date Status  
07/01/2025 DEVELOPMENT PACKAGE NEW v.3 07/24/2025 APPROVED Review Details
03/13/2025 DEVELOPMENT PACKAGE NEW v.1 04/28/2025 REQUIRES RESUBMIT Review Details
05/08/2025 DEVELOPMENT PACKAGE NEW v.2 06/27/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0325-00077
Permite Description: Dental Office, 4,292 SF
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/25/2025 Consultation SITE N/A Partial Pass Discussed storm drain and utilities on site with Contractor and Gustavo. Leaving this inspection as partial pass so that it can be recalled during construction when questions arise.
10/15/2025 ENGR - Drainage Structures N/A Partial Pass October 15/25
Contractor will send good pictures showing correct rebar and spacing 2 inches from forms and 3 inches from dirt no reinforcing in the dirt. Forms needs to be 6 inch in thickness with spacers evenly spaced. Form set to survey nails correct elevations and offsets correct. Drain pipe sloped correctly, joint to main correct and bedding good.
Okay to pour floor and walls pending good pictures. Strip forms inside and out and request reinspection before backfilling.
12/02/2025 For trash and recycling enclosures N/A Partial Pass Light pole footing on south edge needs cleaned out better before pouring.
Trash enclosure needs side bollards and vertical reinforcement spaced appropriately for CMU before pouring footing/slab.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0325-00077
Permit Description: Dental Office, 4,292 SF
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/11/2025 PDSD Engineering Division Pre-Construction SITE Passed Development Package and SWPPP will need to be on site and available at all times.
Storm Water Initial inspection needs to be completed before Inspections can be requested. Make sure NOI is in place. You can then call in Storm water initial Inspection in the portal.
Get BMP’s in SWPPP plan in place on site then you can start work.

Inspections list:
Grading
Paving
Setback/Sign Footer/Excavation
Flatwork
Striping
Site Consultation
09/16/2025 SITE - Stormwater Setup and Controls Passed Stormwater initial meeting held on-site. Control measures are in place as necessary. Site will be monitored for necessary changes.

Documents

File Name Document Type  
1-4267D - DRAINAGE STATEMENT-DS01_V1.PDF DOCUMENTS VIEW
1-4267D - GEOTECHNICAL REPORT - LOT 47 HTC_V1.PDF DOCUMENTS VIEW
APPROVED - 3-4267D - DEVELOPMENT PACKAGE 2025.06.30_V1 - STAMPED 07.24.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
FACILITIES MAP.PDF DOCUMENTS VIEW
REDLINE.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW