Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Development Package and SWPPP will need to be on site and available at all times. Storm Water Initial inspection needs to be completed before Inspections can be requested. Make sure NOI is in place. You can then call in Storm water initial Inspection in the portal. Get BMP’s in SWPPP plan in place on site then you can start work. Inspections list: Grading Paving Setback/Sign Footer/Excavation Flatwork Striping Site Consultation |