Inspection History Details
Inspection Status: Passed
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | ENGR - Drainage Structures | Passed | retention areas are corrected. Drainage is complete in accordance with approved plans. | |
| 10/15/2025 | ENGR - Drainage Structures | Partial Pass | October 15/25 Contractor will send good pictures showing correct rebar and spacing 2 inches from forms and 3 inches from dirt no reinforcing in the dirt. Forms needs to be 6 inch in thickness with spacers evenly spaced. Form set to survey nails correct elevations and offsets correct. Drain pipe sloped correctly, joint to main correct and bedding good. Okay to pour floor and walls pending good pictures. Strip forms inside and out and request reinspection before backfilling. |
|
| 10/17/2025 | ENGR - Drainage Structures | Not Ready | 10/17/25 Contractor and Superintendent have opted to remove the work done and install a precast PAG type 1 307 Double Catch Basin basin. | |
| 10/28/2025 | ENGR - Drainage Structures | Partial Pass | Okay to button up forms and pour |