Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2026 | For trash and recycling enclosures | Partial Pass | Okay to grout walls. Com permit approved with different refuse enclosure design. See COM permit for as-built dimensions. | |
| 04/08/2026 | For trash and recycling enclosures | Passed | 4/8/26 - Trash enclosure is complete in accordance with approved plans. | |
| 12/02/2025 | For trash and recycling enclosures | Partial Pass | Light pole footing on south edge needs cleaned out better before pouring. Trash enclosure needs side bollards and vertical reinforcement spaced appropriately for CMU before pouring footing/slab. |