Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0325-00077
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2026 | For trash and recycling enclosures | Partial Pass | Okay to grout walls. Com permit approved with different refuse enclosure design. See COM permit for as-built dimensions. | |
| 12/02/2025 | For trash and recycling enclosures | Partial Pass | Light pole footing on south edge needs cleaned out better before pouring. Trash enclosure needs side bollards and vertical reinforcement spaced appropriately for CMU before pouring footing/slab. |