Permit: TD-DEV-0225-00045
Permit Details
Status:
Inspections
Type:
Development Package
Address:
1440 S CRAYCROFT RD
Address NEW:
1440 S CRAYCROFT RD
Apply Date:
02/06/2025
Applicant:
Jason Stubblefield
Description:
LINKED TO CIP-0424-00011-Security upgrades to fence, lighting, demo pool.
Permit Reviews
Permit Number - TD-DEV-0225-00045
Permit Status: Inspections
Permit Description: LINKED TO CIP-0424-00011-Security upgrades to fence, lighting, demo pool.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/20/2025 | APPROVED |
| 02/10/2025 | DEVELOPMENT PACKAGE NEW v.1 | 02/25/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0225-00045
Permit Status: Inspections
Permit Description: LINKED TO CIP-0424-00011-Security upgrades to fence, lighting, demo pool.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/10/2025 | Prior To Final |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0225-00045
Permite Description: LINKED TO CIP-0424-00011-Security upgrades to fence, lighting, demo pool.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2026 | N/A | Partial Pass | Sidewalk forms between buildings, "loading area", forms are set in compliance with necessary slope and dimensional requirements, change to layout to be redlined. | |
| 07/30/2026 | ENGR Paving | N/A | Partial Pass | Paving layout, compaction, & slopes are good. Appropriate approvals have been obtained to proceed with "match existing" for asphalt sections. Okay to pave. |
| 08/06/2026 | N/A | Partial Pass | ADA parking stall on North side is complete and within acceptable tolerance. Striping, slopes, dimensions, and signage are good. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0225-00045
Permit Description: LINKED TO CIP-0424-00011-Security upgrades to fence, lighting, demo pool.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Stamped plans are on-site, trenching has been protected, resident entrance still needs attention to provide a stable means of ingress and egress for traffic. Okay to begin construction. |