Inspection History Details
Inspection Status: Re-inspection required
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2026 | PDSD Engineering Division Pre-Construction SITE | Re-inspection required | Pre-construction meeting held on-site on February 13th, 2026: Stamped plan set was not available at this time. construction entrance and resident entrance do not have adequate controls to prevent track out or damage to resident vehicles. Open trenching needs to be protected. Recall the pre-construction meeting once stamped plans are available. |
|
| 03/31/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Stamped plans are on-site, trenching has been protected, resident entrance still needs attention to provide a stable means of ingress and egress for traffic. Okay to begin construction. |