Permit Details

Status:
Fees Paid
Type:
Development Package
Address NEW:
3101 S COUNTRY CLUB RD
Apply Date:
02/17/2023
Applicant:
Ben Kauffman
Description:
*Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex

Permit Reviews

Permit Number - TD-DEV-0223-00147
Permit Status: Fees paid
Permit Description: *Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
Start Date Submittal Complete Date Status  
02/28/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 04/09/2025 APPROVED Review Details
02/12/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 02/25/2025 REQUIRES RESUBMIT Review Details
08/21/2023 DEVELOPMENT PACKAGE NEW v.1 09/25/2023 APPROVED Review Details
08/05/2024 DEVELOPMENT PACKAGE REVIEW v.1 08/30/2024 APPROVED Review Details
12/12/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 01/09/2025 APPROVED Review Details
05/17/2023 DEVELOPMENT PACKAGE REVIEW v.2 06/05/2023 REQUIRES RESUBMIT Review Details
02/28/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/14/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: TD-DEV-0223-00147
Permite Description: *Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/04/2024 PDSD Engineering Division Pre-Construction SITE N/A Partial Pass Rebar inspection for curb, 1st 320’ of curb on the south west side. Noted, verticals are pounded into dirt to hold the horizontal rebar. Separation of rubber type plumbers tape used. Ron’s concrete was told the remainder needs to be done in a different manor as so no rebar is in contact with dirt.
02/07/2025 ENGR Engineering Final N/A Not Ready Wrong Inspection & Wrong Permit. Should be requested for TC-COM-0823-02021
03/18/2025 ENGR Paving N/A Partial Pass Pad for transformer good to,pour 03/18/25
05/29/2025 SITE - Stormwater Final Inspection N/A Not Ready

Completed Inspections

Permit Status: Fees Paid
Permit Number: TD-DEV-0223-00147
Permit Description: *Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
Total Completed Inspections - 6
Date Description Inspector Results Comments
11/07/2024 PDSD Engineering Division Pre-Construction SITE Passed Rebar on 2’ curb line
03/19/2025 ENGR Grading Final Passed
05/29/2025 Passed Last part of driveway is ready to pour. We are looking into what might be left on this site.
05/29/2025 Final inspection to ensure all landscape and water harvesting SITE Passed In the area on the north side of the project, a 2" rock coverage has already been applied, hydro seed is not needed here. All other areas look good.
05/29/2025 LAND Landscape Appearance & Function Final Passed Everything is looking good, NPPPO has been replanted. All plantings and landscape are to plan
05/29/2025 Passed

Documents

File Name Document Type  
APPROVED 2_DEVELOPMENT PACKAGE_REV 3_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COT - PERMIT RECEIPT.PDF DOCUMENTS VIEW
1_DEVELOPMENT PACKAGE_REV 2_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_DEVELOPMENT PACKAGE_REV 1_V1 (1).PDF APPROVED REVISION.PDF DOCUMENTS VIEW
1_DRAINAGE REPORT_V1.PDF DOCUMENTS VIEW
1_GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW