Permit: TD-DEV-0223-00147
Permit Details
Status:
Fees Paid
Type:
Development Package
Address:
3101 S COUNTRY CLUB RD
Address NEW:
3101 S COUNTRY CLUB RD
Apply Date:
02/17/2023
Applicant:
Ben Kauffman
Description:
*Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
Permit Reviews
Permit Number - TD-DEV-0223-00147
Permit Status: Fees paid
Permit Description: *Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/28/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 04/09/2025 | APPROVED |
| 02/12/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/25/2025 | REQUIRES RESUBMIT |
| 08/21/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/25/2023 | APPROVED |
| 08/05/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 08/30/2024 | APPROVED |
| 12/12/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/09/2025 | APPROVED |
| 05/17/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 06/05/2023 | REQUIRES RESUBMIT |
| 02/28/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/14/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Fees Paid
Permit Number: TD-DEV-0223-00147
Permite Description: *Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | Rebar inspection for curb, 1st 320’ of curb on the south west side. Noted, verticals are pounded into dirt to hold the horizontal rebar. Separation of rubber type plumbers tape used. Ron’s concrete was told the remainder needs to be done in a different manor as so no rebar is in contact with dirt. |
| 02/07/2025 | ENGR Engineering Final | N/A | Not Ready | Wrong Inspection & Wrong Permit. Should be requested for TC-COM-0823-02021 |
| 03/18/2025 | ENGR Paving | N/A | Partial Pass | Pad for transformer good to,pour 03/18/25 |
| 05/29/2025 | SITE - Stormwater Final Inspection | N/A | Not Ready |
Completed Inspections
Permit Status: Fees Paid
Permit Number: TD-DEV-0223-00147
Permit Description: *Revision 3 - Revision 2 started 12/12/2024 Revision #1 (several site changes) started 8/5/2024* Site/Grading/SWPPP/Site Electrical/Landscape/NPPO/Irrigation for a new Vehicle Storage lot serving Fed Ex
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Rebar on 2’ curb line | |
| 03/19/2025 | ENGR Grading Final | Passed | ||
| 05/29/2025 | Passed | Last part of driveway is ready to pour. We are looking into what might be left on this site. | ||
| 05/29/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | In the area on the north side of the project, a 2" rock coverage has already been applied, hydro seed is not needed here. All other areas look good. | |
| 05/29/2025 | LAND Landscape Appearance & Function Final | Passed | Everything is looking good, NPPPO has been replanted. All plantings and landscape are to plan | |
| 05/29/2025 | Passed |