Inspection Status: Partial Pass

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
11/04/2024 PDSD Engineering Division Pre-Construction SITE Partial Pass Rebar inspection for curb, 1st 320’ of curb on the south west side. Noted, verticals are pounded into dirt to hold the horizontal rebar. Separation of rubber type plumbers tape used. Ron’s concrete was told the remainder needs to be done in a different manor as so no rebar is in contact with dirt.
11/07/2024 PDSD Engineering Division Pre-Construction SITE Passed Rebar on 2’ curb line