Inspection Status: Partial Pass
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Partial Pass |
Rebar inspection for curb, 1st 320’ of curb on the south west side. Noted, verticals are pounded into dirt to hold the horizontal rebar. Separation of rubber type plumbers tape used. Ron’s concrete was told the remainder needs to be done in a different manor as so no rebar is in contact with dirt. |
| 11/07/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Rebar on 2’ curb line |