Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2025 |
|
|
Partial Pass |
approximately 150’ of curb line, passed |
| 01/23/2025 |
|
|
Partial Pass |
Two sections of slab looked at, both are good to pour. 1 in the middle section of the north area. And 1 section in the middle of the middle section, 01/23/25 |
| 04/08/2025 |
|
|
Partial Pass |
04/08/25, New driveway slab is good to pour. Walls for transformer pad are good to pour. |
| 04/30/2025 |
|
|
Partial Pass |
04/30/25, the remaining section of new driveway is set to plan and good to pour. |
| 05/02/2025 |
|
|
Partial Pass |
See notes |
| 05/08/2025 |
|
|
Partial Pass |
05/08/25, curb line at entrance to Country Club is good to pour. |
| 05/29/2025 |
|
|
Passed |
Last part of driveway is ready to pour. We are looking into what might be left on this site. |
| 11/15/2024 |
|
|
Partial Pass |
Final on curb line. |
| 11/25/2024 |
|
|
Partial Pass |
Slab for material area, 3/8 rebar per plan in an 18” mat. 6’ x 6’ supported sections. suggested to incorporate another adobe in the center of the 6’ square. Pictures will be sent to verify. |
| 12/19/2024 |
|
|
Partial Pass |
Middle section of 2 sections slabs good to pour |
| 12/23/2024 |
|
|
Partial Pass |
Small section on the north slab area, approximately a 60 yard pour. Goos to pour. 12/23/24 |