Date Description Inspector Results Comments
01/15/2025 Partial Pass approximately 150’ of curb line, passed
01/23/2025 Partial Pass Two sections of slab looked at, both are good to pour. 1 in the middle section of the north area. And 1 section in the middle of the middle section, 01/23/25
04/08/2025 Partial Pass 04/08/25, New driveway slab is good to pour. Walls for transformer pad are good to pour.
04/30/2025 Partial Pass 04/30/25, the remaining section of new driveway is set to plan and good to pour.
05/02/2025 Partial Pass See notes
05/08/2025 Partial Pass 05/08/25, curb line at entrance to Country Club is good to pour.
05/29/2025 Passed Last part of driveway is ready to pour. We are looking into what might be left on this site.
11/15/2024 Partial Pass Final on curb line.
11/25/2024 Partial Pass Slab for material area, 3/8 rebar per plan in an 18” mat. 6’ x 6’ supported sections. suggested to incorporate another adobe in the center of the 6’ square. Pictures will be sent to verify.
12/19/2024 Partial Pass Middle section of 2 sections slabs good to pour
12/23/2024 Partial Pass Small section on the north slab area, approximately a 60 yard pour. Goos to pour. 12/23/24