Permit: TD-DEV-0223-00144
Permit Details
Apply Date:
02/16/2023
Applicant:
Bruce Call
Description:
***Restricted***Phase 2 started 1/2/25 - This is Phase 1 for a private school and is for 3 pre-manufactured classroom buildings with State of Arizona permits along with the utility hook-ups. The existing building in place is a church/school. The Master Plan is also attached for reference along with the master drainage report, master grading, NPPO. This project is only for approval to place and hook-up the modular classrooms.
Permit Reviews
Permit Number - TD-DEV-0223-00144
Permit Status: Issued
Permit Description: ***Restricted***Phase 2 started 1/2/25 - This is Phase 1 for a private school and is for 3 pre-manufactured classroom buildings with State of Arizona permits along with the utility hook-ups. The existing building in place is a church/school. The Master Plan is also attached for reference along with the master drainage report, master grading, NPPO. This project is only for approval to place and hook-up the modular classrooms.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 04/19/2023 | REQUIRES RESUBMIT |
| 04/14/2025 | DEVELOPMENT PACKAGE NEW v.3 | 05/02/2025 | REQUIRES RESUBMIT |
| 05/23/2023 | DEVELOPMENT PACKAGE REVIEW v.4 | 06/14/2023 | REQUIRES RESUBMIT |
| 01/22/2025 | DEVELOPMENT PACKAGE NEW v.2 | 04/08/2025 | REQUIRES RESUBMIT |
| 01/03/2025 | DEVELOPMENT PACKAGE NEW v.1 | 01/15/2025 | REQUIRES RESUBMIT |
| 06/15/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/29/2023 | REQUIRES RESUBMIT |
| 05/02/2025 | DEVELOPMENT PACKAGE NEW v.4 | 05/27/2025 | REQUIRES RESUBMIT |
| 05/28/2025 | DEVELOPMENT PACKAGE NEW v.5 | 05/28/2025 | APPROVED |
| 07/11/2023 | DEVELOPMENT PACKAGE NEW v.3 | 07/11/2023 | APPROVED |
| 02/28/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/06/2023 | REQUIRES RESUBMIT |
| 07/03/2023 | DEVELOPMENT PACKAGE NEW v.2 | 07/07/2023 | REQUIRES RESUBMIT |
| 05/04/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 05/15/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0223-00144
Permite Description: ***Restricted***Phase 2 started 1/2/25 - This is Phase 1 for a private school and is for 3 pre-manufactured classroom buildings with State of Arizona permits along with the utility hook-ups. The existing building in place is a church/school. The Master Plan is also attached for reference along with the master drainage report, master grading, NPPO. This project is only for approval to place and hook-up the modular classrooms.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | ENGR Engineering Final | N/A | Partial Pass | Partial pass only, ready for a TCO4 for the following areas only. 1) Phase 1 Mod Bld. 1 Mod Bld. 2 Mod Bld. 3 Existing building & parking on the south side and small area of parking on the north side for teachers only. |
| 08/07/2024 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | To be completed at a later date. |
| 08/07/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | To be completed at a later date. |
| 09/12/2023 | ENGR Grading Final | N/A | Partial Pass | Trash enclosure footing at South end of project ok to pour. |
| 07/30/2025 | N/A | Partial Pass | 7/30/25 Rebar is in place in toe of curb. Curb ramp correct. This is the last section of sidewalk and curb at entrance/exit on 12th Ave. Okay to pour. No Need for expansion joints in Flatwork in front of refuse containers. Flatwork is correct with remesh reinforcing. Call in Paving inspection for Friday. Sweep up dirt on S 12th Avenue. Add Rock to the Trackout. |
|
| 08/14/2025 | ENGR - Drainage Structures | N/A | Partial Pass | 8/14/25 partial pass to backfill pipe. 8/14/25 I looked at 18" Drain pipe bedded between 3 Catch Basins at NW of site. Pipe is bedded correctly and is in line with survey nails for placement. Okay to backfill. Holes are dug for Catch Basins but 4 cft Gravel drain underneath CB not centered correctly as shown in plan. Contractor will remove gravel where needed and center it correctly. Gravel will be replaced with fill and compacted with machine. Forms at bottom of Cb will be moved out 3" to increase bearing surface of slab 6" each way. I will check gravel/forms tomorrow when looking at reinforcing for CB's |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0223-00144
Permit Description: ***Restricted***Phase 2 started 1/2/25 - This is Phase 1 for a private school and is for 3 pre-manufactured classroom buildings with State of Arizona permits along with the utility hook-ups. The existing building in place is a church/school. The Master Plan is also attached for reference along with the master drainage report, master grading, NPPO. This project is only for approval to place and hook-up the modular classrooms.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2024 | SITE - Zoning Final | Passed | ||
| 06/24/2025 | NPPO Pre-Construction | Passed | Call in your precon and Swppp inspection. | |
| 07/25/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Some work has been done it looks correct to plan. contractor will call in needed inspection s going forward. | |
| 07/25/2025 | SITE - Stormwater Setup and Controls | Passed | SWPPP book needs to be on site and accessible | |
| 08/15/2025 | ENGR Paving | Passed | 8/15/25 Paving looks correct. Levels on curbs and curb cuts look consistent and good. Drainage looks good to the intent. Submit Cert confirming Pcc/cot sspi #406 mix #2 to portal. Slopes at ADA Parking and aisles comply. |