Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0223-00144
Inspection Description - ENGR - Drainage Structures
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | ENGR - Drainage Structures | Not Ready | To be completed at a later date. | |
| 08/14/2025 | ENGR - Drainage Structures | Partial Pass | 8/14/25 partial pass to backfill pipe. 8/14/25 I looked at 18" Drain pipe bedded between 3 Catch Basins at NW of site. Pipe is bedded correctly and is in line with survey nails for placement. Okay to backfill. Holes are dug for Catch Basins but 4 cft Gravel drain underneath CB not centered correctly as shown in plan. Contractor will remove gravel where needed and center it correctly. Gravel will be replaced with fill and compacted with machine. Forms at bottom of Cb will be moved out 3" to increase bearing surface of slab 6" each way. I will check gravel/forms tomorrow when looking at reinforcing for CB's |
|
| 08/15/2025 | ENGR - Drainage Structures | Partial Pass | 8/15/25 3 Cast in place Catch basins w/ 6" walls 3' x3', with drain at bottom, drain grate at rim. 18' HDPE running in an L shape from play/courtyard area south towards driveway area and then west to S. 12 th Ave. Bottom of CB slab was increased to 4x4 for more bearing source against natural earth. (drain gravel was not centered on drain hole unevenly placed.).#4 rebar is correct to plan on slab at bottom. Okay to pour slab on bottom. Form the walls and and studded steel angle grate rim and call us back out to look at them before you schedule the next pour |
|
| 08/19/2025 | ENGR - Drainage Structures | Partial Pass | 8/19/25 3 Catch Basins are formed correctly snap ties are in place. Rebar is correct. Studded angle for grate at rim correct. Ok to pour. Call us back out after forms are stripped and before backfilling. Make sure pipe is neatly trimmed if needed a few inches from inside catch basin wall. Patch snap ties holes. |
|
| 08/21/2025 | ENGR - Drainage Structures | Partial Pass | 8/21/25 3 CB's-Pour looks good. Pipe joints to CB's look good. Snap tie holes are not patched. Patch holes and provide pictures. Do not backfill until pictures are accepted as good. 8/22/25. Snap tie holes are patched. Okay the backfill. |
|
| 09/15/2023 | ENGR - Drainage Structures | Partial Pass | South end trash enclosure all vertical rebar is in place and bond beam is completed, ready to grout. |