Permit: TD-DEV-0223-00140
Permit Details
Apply Date:
02/15/2023
Applicant:
Lucas Trautman
Description:
*Revision #4 (solar canopies) started 8/22/2024* *Revision #3 (fire service) started 5/22/2024* *Revision #2 started 4/8/24 (elimination of items including reducing building size)* Existing bldg. new use, commissary kitchen, storage and office space
Permit Reviews
Permit Number - TD-DEV-0223-00140
Permit Status: Complete
Permit Description: *Revision #4 (solar canopies) started 8/22/2024* *Revision #3 (fire service) started 5/22/2024* *Revision #2 started 4/8/24 (elimination of items including reducing building size)* Existing bldg. new use, commissary kitchen, storage and office space
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 05/18/2023 | REQUIRES RESUBMIT |
| 06/08/2023 | DEVELOPMENT PACKAGE NEW v.1 | 10/24/2023 | APPROVED |
| 02/15/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/21/2023 | REQUIRES RESUBMIT |
| 02/28/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/15/2023 | REQUIRES RESUBMIT |
| 10/25/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/08/2023 | APPROVED |
| 12/20/2024 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 01/27/2025 | APPROVED |
| 05/22/2024 | DEVELOPMENT PACKAGE NEW v.1 | 06/13/2024 | APPROVED |
| 10/21/2024 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 11/20/2024 | REQUIRES RESUBMIT |
| 08/22/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/12/2024 | REQUIRES RESUBMIT |
| 04/08/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/25/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0223-00140
Permite Description: *Revision #4 (solar canopies) started 8/22/2024* *Revision #3 (fire service) started 5/22/2024* *Revision #2 started 4/8/24 (elimination of items including reducing building size)* Existing bldg. new use, commissary kitchen, storage and office space
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2025 | ENGR Paving | N/A | Partial Pass | Contractor used wrap AB good pay on the south parking lot |
| 10/09/2024 | N/A | Partial Pass | Contractor poured sidewalk on the south end of the building 5’ x 150 everything everything looks good at this time |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0223-00140
Permit Description: *Revision #4 (solar canopies) started 8/22/2024* *Revision #3 (fire service) started 5/22/2024* *Revision #2 started 4/8/24 (elimination of items including reducing building size)* Existing bldg. new use, commissary kitchen, storage and office space
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 07/29/2024 | Consultation SITE | Passed | Informed the contractor to call in every two weeks for stormwater inspections | |
| 01/29/2025 | For trash and recycling enclosures | Passed | Sub grade compaction noted and passed. | |
| 04/21/2025 | COT - ENGR - Signage Final | Passed | ||
| 04/21/2025 | SITE - Zoning Final | Passed | ||
| 04/21/2025 | ENGR Paving | Passed | ||
| 04/21/2025 | Passed | |||
| 04/21/2025 | Passed | |||
| 04/23/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/23/2025 | Passed | CO READY |