Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | Partial Pass | |||
| 04/21/2025 | Passed | |||
| 10/09/2024 | Partial Pass | Contractor poured sidewalk on the south end of the building 5’ x 150 everything everything looks good at this time |