Permit: TD-DEV-0223-00130
Permit Details
Apply Date:
02/03/2023
Applicant:
Description:
PRIVATE GRADING, PAVING & DRAINAGE PLANS FOR ENCANTADA AT LA ESTANCIA
Permit Reviews
Permit Number - TD-DEV-0223-00130
Permit Status: Issued
Permit Description: PRIVATE GRADING, PAVING & DRAINAGE PLANS FOR ENCANTADA AT LA ESTANCIA
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/03/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/20/2023 | REQUIRES RESUBMIT |
03/27/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 04/27/2023 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0223-00130
Permite Description: PRIVATE GRADING, PAVING & DRAINAGE PLANS FOR ENCANTADA AT LA ESTANCIA
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/11/2023 | ENGR - Drainage Structures | N/A | Not Ready | HSL is working with COT for correct permit for site walls. |
06/26/2023 | PDSD Site/Engineering Division - NPPO | N/A | Complete (Recurring) | No concerns with the nursery at this time. Contractors watering it daily. |
10/17/2023 | SITE - Stormwater Setup and Controls | N/A | Not Ready | 1) Only item in place is the basin, no other controls are in place. 2) Concrete washout needs to be cleaned, spoils are to be in pit not on dirt piles to side of pit. |
09/16/2024 | SITE - SWPPP Violation Notice | N/A | Not Applicable | |
09/10/2024 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | Sep 10th, trash enclosure slab Bld. 2 |
07/10/2024 | For trash and recycling enclosures | N/A | Partial Pass | Good pour the floor for the trash enclosure and the apron |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0223-00130
Permit Description: PRIVATE GRADING, PAVING & DRAINAGE PLANS FOR ENCANTADA AT LA ESTANCIA
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | This Precon has been completed by Martin Hernandez on this date | |
07/22/2024 | SITE - Stormwater Follow-up | Passed | This inspection covered, 2 drainage structures 1 refuse pad 2 rebar seat inspections |
|
09/16/2024 | SITE - SWPPP Correction Notice | Passed |