Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - NPPO
Permit Number - TD-DEV-0223-00130
Inspection Description - PDSD Site/Engineering Division - NPPO
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/08/2024 | PDSD Site/Engineering Division - NPPO | Partial Pass | Contractor called in the wrong inspection inspection that I was called out for is for grading and rebar. Inspected CB three basin. Good to pour the floor for the basin. | |
06/07/2024 | PDSD Site/Engineering Division - NPPO | Canceled | Called in by mistake by project manager, not ready yet | |
06/26/2023 | PDSD Site/Engineering Division - NPPO | Complete (Recurring) | No concerns with the nursery at this time. Contractors watering it daily. |