Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - NPPO
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2024 |
PDSD Site/Engineering Division - NPPO |
|
Partial Pass |
Contractor called in the wrong inspection inspection that I was called out for is for grading and rebar. Inspected CB three basin. Good to pour the floor for the basin. |
| 06/07/2024 |
PDSD Site/Engineering Division - NPPO |
|
Canceled |
Called in by mistake by project manager, not ready yet |
| 06/26/2023 |
PDSD Site/Engineering Division - NPPO |
|
Complete (Recurring) |
No concerns with the nursery at this time. Contractors watering it daily. |