Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - TD-DEV-0223-00130
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2024 | SITE - Stormwater Setup and Controls | Partial Pass | I drove through the site. There are no concerns at this time. Most of the work on this site is vertical or the construction of the building pads themselves. | |
01/25/2024 | SITE - Stormwater Setup and Controls | Complete (Recurring) | Storm water controls are being used as best as can be. Basin should not be used as a storage area for materials or connex boxes. | |
02/27/2024 | SITE - Stormwater Setup and Controls | Canceled | ||
03/20/2024 | SITE - Stormwater Setup and Controls | Partial Pass | Storm drain on east side of property and 2 inlet pads to detention area. | |
03/21/2024 | SITE - Stormwater Setup and Controls | Partial Pass | Everything is looking good, roads are getting ready to pave. | |
04/02/2024 | SITE - Stormwater Setup and Controls | Partial Pass | Storm drain passed between bldg 6 and 7 | |
04/08/2024 | SITE - Stormwater Setup and Controls | Partial Pass | Partial pass behind or to the north of building 7 for the storm water pipe. | |
06/12/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | Borderland is continuing to grade and transplant the cactus and the trees there is some barrel cactus on the south end of the project that are just laying there I spoke to the superintendent and he informed me that they will be transparent planet. | |
08/07/2024 | SITE - Stormwater Setup and Controls | Complete (Recurring) | This could possibly be the last drainage structure. I will keep the portal open for future inspections if needed and will close out at the end of project. | |
09/18/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | No concerns at this time | |
10/03/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | They remove the walls around the Fenceline and put up Masonary wall | |
10/17/2023 | SITE - Stormwater Setup and Controls | Not Ready | 1) Only item in place is the basin, no other controls are in place. 2) Concrete washout needs to be cleaned, spoils are to be in pit not on dirt piles to side of pit. |
|
10/27/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | Setup and controls are in place some rock and dirt runoff is around Paseo Monte De Oro and Paseo Alga. | |
11/22/2023 | SITE - Stormwater Setup and Controls | Not Ready | Site closed for the holiday. | |
12/11/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | Wattle is needed in the far north east corner and there are several areas along the west fence line that need to be repaired. | |
12/28/2023 | SITE - Stormwater Setup and Controls | Re-inspection required | Correct address is, 7355 South Wilmot Rd. Wattle needs to be repaired and corrected throughout the north and west fence line |