Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - TD-DEV-0223-00130
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/26/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time. | |
02/14/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Storm water channels and culvert pipe is starting to be implemented. | |
02/28/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Pipe is bedded correctly and slurry is going to be 6” thick. | |
03/05/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | All BPM are in place, no issues | |
03/14/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Inspection for 2 storm drainage structures, both passed. | |
04/10/2024 | SITE - Stormwater Follow-up | Partial Pass | Storm trench behind bld. 6 | |
04/30/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this present time | |
05/22/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
06/13/2024 | SITE - Stormwater Follow-up | Partial Pass | Contractors forming up catch basin number eight the walls good to pour | |
06/26/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
07/10/2023 | SITE - Stormwater Follow-up | Partial Pass | No concerns at this time. Everything looks very good. | |
07/22/2024 | SITE - Stormwater Follow-up | Passed | This inspection covered, 2 drainage structures 1 refuse pad 2 rebar seat inspections |
|
07/24/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | there’s no concerns at this time. | |
08/07/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
08/21/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Everything looks good at this time. It’s no concerns. | |
09/05/2023 | SITE - Stormwater Follow-up | Not Ready | ||
11/27/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Spoke with Jacob the assistant site supervisor and had a good conversation. all issues are being taken care of and no concerns at this time. |