Permit: TD-DEV-0223-00130

Parcel: 141367940


Addresses:

7401 S WILMOT RD

Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
01/26/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time.
02/14/2024 SITE - Stormwater Follow-up Complete (Recurring) Storm water channels and culvert pipe is starting to be implemented.
02/28/2024 SITE - Stormwater Follow-up Complete (Recurring) Pipe is bedded correctly and slurry is going to be 6” thick.
03/05/2024 SITE - Stormwater Follow-up Complete (Recurring) All BPM are in place, no issues
03/14/2024 SITE - Stormwater Follow-up Complete (Recurring) Inspection for 2 storm drainage structures, both passed.
04/10/2024 SITE - Stormwater Follow-up Partial Pass Storm trench behind bld. 6
04/30/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this present time
05/22/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
06/13/2024 SITE - Stormwater Follow-up Partial Pass Contractors forming up catch basin number eight the walls good to pour
06/26/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
07/10/2023 SITE - Stormwater Follow-up Partial Pass No concerns at this time. Everything looks very good.
07/22/2024 SITE - Stormwater Follow-up Passed This inspection covered,
2 drainage structures
1 refuse pad
2 rebar seat inspections
07/24/2023 SITE - Stormwater Follow-up Complete (Recurring) there’s no concerns at this time.
08/07/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
08/21/2023 SITE - Stormwater Follow-up Complete (Recurring) Everything looks good at this time. It’s no concerns.
09/05/2023 SITE - Stormwater Follow-up Not Ready
11/27/2023 SITE - Stormwater Follow-up Complete (Recurring) Spoke with Jacob the assistant site supervisor and had a good conversation. all issues are being taken care of and no concerns at this time.