Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
10096 E OLD VAIL RD
Apply Date:
01/10/2025
Applicant:
Blake Junak
Description:
Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building

Permit Reviews

Permit Number - TD-DEV-0125-00006
Permit Status: Complete
Permit Description: Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
Start Date Submittal Complete Date Status  
02/20/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 03/12/2026 REQUIRES RESUBMIT Review Details
02/11/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 02/11/2026 REQUIRES RESUBMIT Review Details
05/07/2025 DEVELOPMENT PACKAGE NEW v.3 05/09/2025 APPROVED Review Details
01/15/2025 DEVELOPMENT PACKAGE NEW v.1 03/13/2025 REQUIRES RESUBMIT Review Details
04/08/2025 DEVELOPMENT PACKAGE NEW v.2 05/07/2025 REQUIRES RESUBMIT Review Details
03/18/2026 DEVELOPMENT PACKAGE NEW REVISION v.3 03/20/2026 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0125-00006
Permite Description: Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/04/2026 Consultation SITE N/A Partial Pass I went over basins on grading sheet of DP with contractor showing that the basins needed to be enlarged and or made deeper below levels of adjacent hardscape for water harvesting. Make these correct with the grading sheet.

The parking space is not draining correct just west of Refuse Enclosure. It has roughly 1/2" of puddling. The asphalt needs to be repaired for it to drain correctly.
04/09/2026 For trash and recycling enclosures N/A Partial Pass Rebar Mat, Forms, Dimensions and slope are correct for 6" floor. Curbs poured previously will push enclosure gate into inside face of posts but clearance will be ok. Send pictures showing clearance from dirt and response of approval before pouring floor Monday, additional dobies needed for cleanse all around.
05/19/2026 ENGR Engineering Final N/A Re-inspection required Drill holes for refuge enclosure. Install the boulders. Fix the paving at parking space next to refuse enclosure. Handicap Parking sign post needs to be cemented in place per detail A Page 7.
Reschedule when ready.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0125-00006
Permit Description: Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/17/2025 PDSD Engineering Division Pre-Construction SITE Passed Meeting went well, going to have an issue with a street light pole. Plans show this moving back away from street curb by 3 to 5 feet into site. Good possibility that this will void the lumens and where they hit the street location.
05/04/2026 Passed
05/11/2026 SITE - Zoning Final Passed
05/11/2026 Passed
05/19/2026 SITE Passed
06/01/2026 For trash and recycling enclosures Passed
06/01/2026 ENGR Paving Passed
06/01/2026 Passed
06/01/2026 LAND Landscape Appearance & Function Final Passed
06/01/2026 ENGR Engineering Final Passed