Permit: TD-DEV-0125-00006
Permit Details
Status:
Issued
Type:
Development Package
Address:
10096 E OLD VAIL RD
Address NEW:
10096 E OLD VAIL RD
Apply Date:
01/10/2025
Applicant:
Blake Junak
Description:
Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
Permit Reviews
Permit Number - TD-DEV-0125-00006
Permit Status: Issued
Permit Description: Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 03/12/2026 | REQUIRES RESUBMIT |
| 02/11/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/11/2026 | REQUIRES RESUBMIT |
| 05/07/2025 | DEVELOPMENT PACKAGE NEW v.3 | 05/09/2025 | APPROVED |
| 01/15/2025 | DEVELOPMENT PACKAGE NEW v.1 | 03/13/2025 | REQUIRES RESUBMIT |
| 04/08/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/07/2025 | REQUIRES RESUBMIT |
| 03/18/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 03/20/2026 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0125-00006
Permite Description: Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2026 | For trash and recycling enclosures | N/A | Partial Pass | Rebar Mat, Forms, Dimensions and slope are correct for 6" floor. Curbs poured previously will push enclosure gate into inside face of posts but clearance will be ok. Send pictures showing clearance from dirt and response of approval before pouring floor Monday, additional dobies needed for cleanse all around. |
| 04/22/2026 | N/A | Partial Pass | Curb ramp on west side of private street: layout and forms are good. | |
| 04/23/2026 | ENGR Paving | N/A | Partial Pass | AB is good, okay to pave. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0125-00006
Permit Description: Rev 1 - started 02.11.2026 relocated southern driveway entrance, updated trash enclosure configuration, adjusted parking layout, re-routed electrical line, and the addition of water and wastewater services to the future building ** New Valvoline - minor auto service building
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting went well, going to have an issue with a street light pole. Plans show this moving back away from street curb by 3 to 5 feet into site. Good possibility that this will void the lumens and where they hit the street location. |