Inspection Status: Partial Pass
Inspection History: ENGR Paving
| Date |
Description |
Inspector |
Results |
Comments |
| 04/17/2026 |
ENGR Paving |
|
Partial Pass |
Subgrade: slopes, depths, and compaction are good. Okay for AB. |
| 04/22/2026 |
ENGR Paving |
|
Partial Pass |
AB hubs are being placed currently, 4 inch depth is good in isolated areas, majority of site needs work still. Call us back when AB is mostly complete. |
| 04/23/2026 |
ENGR Paving |
|
Partial Pass |
AB is good, okay to pave. |
| 05/11/2026 |
ENGR Paving |
|
Not Ready |
Parking space just west of refuse enclosure is puddling half-inch deep. This needs to be fixed so this parking space drains correctly. |
| 05/19/2026 |
ENGR Paving |
|
Re-inspection required |
1/2" Puddling at parking spot next to Refuse Enclosure still has not been fixed. The asphalt in this area allows the puddling to percolate through within 45 minutes. It needs to be fixed or Engineer of Record needs to submit signed letter accepting paving. |