Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2026 | ENGR Engineering Final | Not Ready | Eight plants missing at southeast landscape border east the parking lot. Parking space just west of refuse enclosure does not drain correct. There's a half inch puddle that evaporate/percolate but it is not draining as designed. This area needs to be repaved for it to drain then restriped. Basins need to be dug larger/deeper to match grading sheets on development plan-all of them need to be addressed. |
|
| 05/19/2026 | ENGR Engineering Final | Re-inspection required | Drill holes for refuge enclosure. Install the boulders. Fix the paving at parking space next to refuse enclosure. Handicap Parking sign post needs to be cemented in place per detail A Page 7. Reschedule when ready. |