Inspection History Details
Inspection Status: Not Ready
Inspection History: LAND Landscape Appearance & Function Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2026 | LAND Landscape Appearance & Function Final | Not Ready | Basins do not match water harvesting basins on grading sheet of development package. I can't pass irrigation inspection or landscape inspections until this is corrected. SE Corner of building Sidewalk scupper invert is buried. This scupper outlet is supposed to be grouted rip rap into a water harvesting basin. |
|
| 05/19/2026 | LAND Landscape Appearance & Function Final | Re-inspection required | 22 9 ton +/- Boulders are not placed in landscape. Schedule when ready.. |