Permit: TD-DEV-0124-00025
Permit Details
Status:
Inspections
Type:
Development Package
Address:
6175 S MIDVALE PARK RD
Address NEW:
6175 S MIDVALE PARK RD
Apply Date:
01/31/2024
Applicant:
Carlos Navarro
Description:
Construction of 64 new apartment units on a common site with adjacent existing church
Permit Reviews
Permit Number - TD-DEV-0124-00025
Permit Status: Inspections
Permit Description: Construction of 64 new apartment units on a common site with adjacent existing church
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2024 | DEVELOPMENT PACKAGE NEW v.4 | 07/26/2024 | APPROVED |
| 06/18/2024 | DEVELOPMENT PACKAGE NEW v.3 | 07/09/2024 | REQUIRES RESUBMIT |
| 04/08/2024 | DEVELOPMENT PACKAGE NEW v.2 | 05/08/2024 | REQUIRES RESUBMIT |
| 01/31/2024 | DEVELOPMENT PACKAGE NEW v.1 | 03/09/2024 | REQUIRES RESUBMIT |
| 10/28/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 10/28/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0124-00025
Permit Status: Inspections
Permit Description: Construction of 64 new apartment units on a common site with adjacent existing church
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0124-00025
Permite Description: Construction of 64 new apartment units on a common site with adjacent existing church
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | Grading Progress ENGR | N/A | Not Ready | |
| 07/03/2025 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | 1) Continue with street cleanup on Midvale and where your track out is located from Midvale to entrance to storage yard. Ensure this is completed prior to end of day on the 3rd. 2) track out at the entrench to the trailer is pretty heavy and needs to also be maintained as soon as possible. |
| 06/02/2025 | N/A | Partial Pass | 06/02/25, okay to grout lower section of wall | |
| 08/19/2025 | For trash and recycling enclosures | N/A | Partial Pass | 08/19/25, slab passed on both enclosures |
| 10/31/2025 | Consultation SITE | N/A | Partial Pass | Repeat of prior meeting. will revisit TCO requirements after paving. |
| 11/03/2025 | N/A | Partial Pass | Contract is good for 200 lineal feet of valley gutter | |
| N/A | Requested | |||
| 12/04/2025 | ENGR Paving | N/A | Partial Pass | contractor and I walked the project check for low spots and ponding area. Water tested. It found some areas that needed to be addressed by the contractor the north east corner ponded issue there and the south east corner. There’s also another area there. The south parking lot a lot of it drains towards, the front curb which plans call for it to drain towards the valley gutter. The handicap parking the striping encroaches into the valley gutter area |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0124-00025
Permit Description: Construction of 64 new apartment units on a common site with adjacent existing church
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | SITE - Stormwater Setup and Controls | Passed | the initial is completed, site is in good shape, suggested to move and re-do the concrete washout to a more stable location with better confinement. | |
| 02/07/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 02/11/2025 | Passed | Rough grade was completed, hubs have been witnessed as well as flag and slopes. Building pads have had compaction completed and meet specs. |