Inspection Status: Partial Pass

Inspection History: ENGR Paving

Permit Number - TD-DEV-0124-00025

Inspection Description - ENGR Paving

Inspection Status - Partial Pass

Date Description Inspector Results Comments
11/12/2025 ENGR Paving Partial Pass Contractor paved the entrance north of the buildings went around to the east parking lot area and drive area made turned headed west south of the building looks good at this time
12/04/2025 ENGR Paving Partial Pass contractor and I walked the project check for low spots and ponding area. Water tested. It found some areas that needed to be addressed by the contractor the north east corner ponded issue there and the south east corner. There’s also another area there. The south parking lot a lot of it drains towards, the front curb which plans call for it to drain towards the valley gutter. The handicap parking the striping encroaches into the valley gutter area