Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2026 | ENGR Engineering Final | Partial Pass | Contractor needs to address the issues with the crosswalks they’re noncompliant | |
| ENGR Engineering Final | Re-inspection required | The Northeast crosswalk is now compliant. Running slope does not exceed 5%. However the other crosswalk on Southwest end of building still exceeds 5% in a few spots that have been worked on to fix running slope. Both my and contractors levels confirmed this. Reschedule inspection when SW crosswalk is compliant. |
||
| 02/18/2026 | ENGR Engineering Final | Passed |