Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
05/23/2025 Partial Pass Buildings B & C flat work at interior patios. Maintain a 2" separation from dirt on a 4" slab using #3 rebar. Insure that size of turndown is suitable for the weight of the staircases.
08/19/2025 Partial Pass 08/19/25, leading edge of the atrium sidewalks going into units on building 4, lower level.
09/18/2025 Partial Pass Contractors pouring curb on the south end of the buildings good pour
10/08/2025 Failed Sidewalk area needs to be compacted in front of building C
11/03/2025 Partial Pass Contract is good for 200 lineal feet of valley gutter