Permit: TC-RES-1224-07036
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
3913 S 4TH AV
Address NEW:
3913 S 4TH AV
Apply Date:
12/04/2024
Applicant:
Melissa Barron
Description:
SFR
Permit Reviews
Permit Number - TC-RES-1224-07036
Permit Status: Inspections
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2025 | RESTAMP - RESIDENTIAL v.1 | 02/04/2025 | REQUIRES RESUBMIT |
| 01/31/2025 | RESIDENTIAL NEW DWELLING v.2 | 02/03/2025 | APPROVED |
| 12/05/2024 | RESIDENTIAL NEW DWELLING v.1 | 01/08/2025 | REQUIRES RESUBMIT |
| 03/14/2025 | RESTAMP - RESIDENTIAL v.2 | 03/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-1224-07036
Permit Status: Inspections
Permit Description: SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-RES-1224-07036
Permit Status: Inspections
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 01/31/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/03/2025 | ||
| 02/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1224-07036
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2026 | COT - RSPL - Rough Soil | N/A | Partial Pass | partial pass pending tie in |
| 06/08/2026 | COT - RSPL - Sewer | N/A | Not Ready | |
| 06/18/2026 | COT - RSBU - Preslab | N/A | Partial Pass | 06/18/2026 Approved per plan and reinforcement - okay for concrete placement. Verified wrapped drain pipe going through footing, added chains to steel mesh touch earth, and widened footings at covered patio. Partial pass pending letter uploaded into TEC online portal clarifying project if north SFR is on separate permit per site plan sheet. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1224-07036
Permit Description: SFR
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 06/18/2026 Approved per plan. |
|
| 09/24/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9-24-26 all previous items have been corrected. Roof has been walked OK to proceed. | |
| 09/24/2026 | COT - RSBU - Roof Nailing | Passed | 9-24-26 all previous items have been corrected. Roof has been walked OK to proceed. |