Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2026 | COT - RSBU - Preslab | Partial Pass | 06/18/2026 Approved per plan and reinforcement - okay for concrete placement. Verified wrapped drain pipe going through footing, added chains to steel mesh touch earth, and widened footings at covered patio. Partial pass pending letter uploaded into TEC online portal clarifying project if north SFR is on separate permit per site plan sheet. |