Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-1224-07036
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/08/2025 | Site Zoning | APPROVED | |||
| 01/03/2025 | Site Engineering | NOT REQUIRED | |||
| 12/19/2024 | Site Landscape | NOT REQUIRED | |||
| 01/08/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/23/2024 | Residential Building | REQUIRES RESUBMIT | TC-RES-1224-07036 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2018 IRC with amendments and building ordinances for all dwellings. Provide a response letter addressing each comment with location of change on the plans. Submit separate letter and plan set files. GENERAL COMMENTS : 1. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. 2. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Provide a future PV breaker space at the last panel space. 3. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one-story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations 4. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space. PLANS: 1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route. SECTIONS - DETAILS: 1. Show exterior wood siding, sheathing and wall framing with a 6” clearance above the ground (R317.1 item 5). The weep screed may extend with a minimum clearance 4” above grade or 2” above paved areas, R703.7.2.1. Update detail #2 on A1.0. 2. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38. Clarify the ceiling/roof insulation detail showing the air-impermeable rigid insulation material adhered to either side of the roof sheathing along with the batt insulation. Update keynote #2 sheet on A3. PLUMBING PLANS: 1. Provide the water pipe diameter between the meter and shut off valve in compliance with P2903.7. A minimum 1” service pipe is required for supplying water to more than 9.5 fixture units. 2. Show an individual accessible water supply shut off for the dwelling, P2903.9.1. ELECTRICAL PLANS: 1. TEP may require a dual metered service panel for the property at the closest building to the service transformer. A service line change or a new meter location must be coordinated with TEP for approval. Show an underground feeder from a new metered service panel to the more distant dwelling. 2. Update the Riser Diagram for the close dwelling and the feeder size to the detached dwelling panel per TEP coordination, NEC 225.30 and E3403. 3. Provide the Electric Vehicle Supply Equipment 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready” and locate the receptacle at a parking area, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2. OUTDOOR LIGHTING CODE 1. Show full cutoff fixtures were located within 25 feet from the property line OLC 401.3.3. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services |
||
| 12/05/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |