Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
12/15/2023
Applicant:
Anne Helwig
Description:
SFR

Permit Reviews

Permit Number - TC-RES-1223-10106
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
12/18/2023 RESIDENTIAL NEW DWELLING v.1 01/11/2024 REQUIRES RESUBMIT Review Details
04/10/2024 RESIDENTIAL NEW DWELLING v.2 05/10/2024 APPROVED Review Details
02/08/2024 RESTAMP - RESIDENTIAL v.1 02/09/2024 APPROVED Review Details
01/12/2024 RESIDENTIAL NEW DWELLING v.2 01/12/2024 REQUIRES RESUBMIT Review Details
04/08/2024 RESIDENTIAL NEW DWELLING v.1 04/08/2024 REQUIRES RESUBMIT Review Details
01/18/2024 RESIDENTIAL NEW DWELLING v.3 02/08/2024 APPROVED Review Details
08/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-1223-10106
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date Name
01/02/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-RES-1223-10106
Permit Status: Issued
Permit Description: SFR
Date Description Comments
01/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-1223-10106
Permite Description: SFR
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/25/2024 COT - RSBU - Masonry Pregrout N/A Partial Pass South half of structure is topped out at 22’; North portion of structure is at 16’. Ok to grout progress areas.
01/31/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 1/30/25
Water heater not working; clean outs missing through out; please refer to plan.
01/31/2025 RSBU - Building Final N/A Re-inspection required 1/30/25

Not ready.
01/31/2025 COT - RSME - Mechanical Final N/A Re-inspection required 1/30/25

Thermostat is too high, needs to be at 48 inches; No access to HVAC; water heater not working. Extra panel added in garage, not per plan.
01/31/2025 COT - RSEL - Outdoor Lighting N/A Re-inspection required 1/30/25

Not ready, lights were not functional and scaffolding was in the way.
01/31/2025 COT - RSEL - Electrical Final N/A Re-inspection required 1/30/25

Not ready. Multiple GFCIs without power; wall plates missing; Extra panel added in garage, not per plan.

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-1223-10106
Permit Description: SFR
Total Completed Inspections - 13
Date Description Inspector Results Comments
04/18/2024 COT - RSPL - Rough Soil Passed
04/18/2024 COT - RSPL - Sewer Passed
04/18/2024 COT - RSPL - Yard Water Line Passed
04/18/2024 COT - RSBU - Preslab Passed 4/18/24: reinforcement per plans ok to proceed.
04/18/2024 COT - RSEL - Electrical Underground Passed
04/18/2024 COT - RSEL - Grounding/Bonding Passed
04/18/2024 BULD - Electrical Clearance Passed 4/18/24: RECN TEP CLEARANCE
08/12/2024 COT - RSBU - Masonry Pregrout Passed
08/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/14/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/14/2024 COT - RSBU - Roof Nailing Passed
09/11/2024 COT - RSBU - Interior Shear Bracing Passed
09/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed OK to insulate and cover walls.

Scheduled Inspections

Scheduled Inspections - TC-RES-1223-10106
Status: Issued
Description: SFR
Scheduled Date Description Entered By Entered Date
02/05/2025 COT - RSME - Mechanical Final Scheduled
02/05/2025 COT - RSPL - Plumbing Final Scheduled
02/05/2025 COT - RSEL - Outdoor Lighting Scheduled
02/05/2025 RSBU - Building Final Scheduled
02/05/2025 COT - RSEL - Electrical Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
BROWN FLR LAYOUT_V1.PDF DOCUMENTS VIEW
BROWN ROOF LAYOUT_V1.PDF DOCUMENTS VIEW
R83477255.J2401048B_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_PLAN SET PLUMBING REVISION_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_PLAN_SET_V2.PDF DOCUMENTS VIEW
1_PT_CALCS_V2.PDF DOCUMENTS VIEW
1_SOILS_REPORT_V2.PDF DOCUMENTS VIEW
SI CERTIFICATE PART 2-2024-01-15_V2.PDF DOCUMENTS VIEW