Permit: TC-RES-1222-01488
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2026 E 17TH ST
Address NEW:
2026 E 17TH ST
Apply Date:
12/13/2022
Applicant:
Dana Berry
Description:
SFR
Permit Reviews
Permit Number - TC-RES-1222-01488
Permit Status: Inspections
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2023 | RESIDENTIAL NEW DWELLING v.2 | 05/23/2023 | REQUIRES RESUBMIT |
| 01/19/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/14/2023 | REQUIRES RESUBMIT |
| 07/10/2023 | RESIDENTIAL NEW DWELLING v.3 | 07/25/2023 | APPROVED |
Conditions
Permit Number - TC-RES-1222-01488
Permit Status: Inspections
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 07/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1222-01488
Permite Description: SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial pass. Rebar in footings per plan. Pending #4 horizontal dowels every 32 o.c. Okay for concrete placement in footing. 12/6/2023 |
| 02/07/2024 | COT - RSBU - Masonry Pregrout | N/A | Re-inspection required | 1/23/24: vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A, Not ready rebar not per plan. 1/29/2024 2/1/24 3rd lift ok for grout 1/30/24:vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A. Proceed at risk second lift ok to grout. Revision will need to be submitted prior to final inspection showing change in horizontal reinforcement. 2/7/24: reinforcement not per plan (rebar lap for #5 must be 30" and they must be spaced 32" o.c), plans call for 3 #5 continuous at top 4 courses not per plan, reinforcement not per plan. |
| 06/07/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Electric clearance for temporary construction power only. |
| 06/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6/28/24: corrections not made from previous inspection |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1222-01488
Permit Description: SFR
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 01/02/2024 | COT - RSPL - Rough Soil | Passed | ||
| 01/10/2024 | COT - RSBU - Preslab | Passed | ||
| 02/09/2024 | COT - RSBU - Masonry Pregrout | Passed | ||
| 03/01/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/20/2025 | COT - BULD - SWG Clearance | Passed | Ok to set gas meter and start new service; Code: ECO | |
| 04/16/2025 | RSBU - Building Final | Passed |