Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2024 | COT - RSBU - Masonry Pregrout | Re-inspection required | 1/23/24: vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A, | |
| 01/29/2024 | COT - RSBU - Masonry Pregrout | Re-inspection required | Not ready rebar not per plan. 1/29/2024 | |
| 01/30/2024 | COT - RSBU - Masonry Pregrout | Partial Pass | 1/23/24: vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A, Not ready rebar not per plan. 1/29/2024 1/30/24:vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A. Proceed at risk second lift ok to grout. Revision will need to be submitted prior to final inspection showing change in horizontal reinforcement. |
|
| 02/01/2024 | COT - RSBU - Masonry Pregrout | Partial Pass | ||
| 02/07/2024 | COT - RSBU - Masonry Pregrout | Re-inspection required | 1/23/24: vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A, Not ready rebar not per plan. 1/29/2024 2/1/24 3rd lift ok for grout 1/30/24:vertical reinforcement is per plan #5 rebar at 32"O.C, horizontal reinforcement calls out for #5 rebar at 24"O.C per plan (8" reinforcement ladder mesh was installed) detail 6/A. Proceed at risk second lift ok to grout. Revision will need to be submitted prior to final inspection showing change in horizontal reinforcement. 2/7/24: reinforcement not per plan (rebar lap for #5 must be 30" and they must be spaced 32" o.c), plans call for 3 #5 continuous at top 4 courses not per plan, reinforcement not per plan. |
|
| 02/09/2024 | COT - RSBU - Masonry Pregrout | Passed |