Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
12/01/2022
Applicant:
Hector Rubio
Description:
NEW SFR

Permit Reviews

Permit Number - TC-RES-1222-01229
Permit Status: Issued
Permit Description: NEW SFR
Start Date Submittal Complete Date Status  
10/20/2023 RESIDENTIAL NEW DWELLING v.3 11/08/2023 APPROVED Review Details
09/13/2023 RESIDENTIAL NEW DWELLING v.2 10/09/2023 REQUIRES RESUBMIT Review Details
11/08/2023 RESTAMP - RESIDENTIAL v.1 11/13/2023 APPROVED Review Details
01/27/2023 RESIDENTIAL NEW DWELLING v.1 01/30/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-1222-01229
Permit Status: Issued
Permit Description: NEW SFR
Date Description Comments
11/13/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-1222-01229
Permite Description: NEW SFR
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/30/2024 BULD - Electrical Clearance N/A Re-inspection required No sweep or riser with weather head installed on electrical panel. No access to building to verify Ufer ground is properly connected.

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-1222-01229
Permit Description: NEW SFR
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/09/2024 COT - RSPL - Rough Soil Passed 2/9/24: okay to back fill underground plumbing needs inspection for sewer connection
04/05/2024 COT - RSBU - Preslab Passed 4/5/24: Setback is 10' from property line on north side of lot. Concrete forms are in place, footings are dug per plans, rebar reinforcement is installed per plans, and 20' piece of rebar is bent and connected to the bottom rebar reinforcement of footing for a Ufer ground. Okay to proceed with concrete pour.
04/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 4/5/24: Setback is 10' from property line on north side of lot. Concrete forms are in place, footings are dug per plans, rebar reinforcement is installed per plans, and 20' piece of rebar is bent and connected to the bottom rebar reinforcement of footing for a Ufer ground. Okay to proceed with concrete pour.
04/05/2024 COT - RSEL - Grounding/Bonding Passed 4/5/24: Setback is 10' from property line on north side of lot. Concrete forms are in place, footings are dug per plans, rebar reinforcement is installed per plans, and 20' piece of rebar is bent and connected to the bottom rebar reinforcement of footing for a Ufer ground. Okay to proceed with concrete pour.
06/26/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical.
06/26/2024 RSBU - Building Progress Passed Base plates are secured to concrete floor with shot pins, poured in place bolts or titan bolts. Plywood sheathing is properly secured to studs per plan requirements for shear walls. Okay to proceed with dry-in for stucco work. Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical.
06/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed Base plates are secured to concrete floor with shot pins, poured in place bolts or titan bolts. Plywood sheathing is properly secured to studs per plan requirements for shear walls. Okay to proceed with dry-in for stucco work.
07/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.

Scheduled Inspections

Scheduled Inspections - TC-RES-1222-01229
Status: Issued
Description: NEW SFR
Scheduled Date Description Entered By Entered Date
11/20/2024 BULD - Electrical Clearance Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-CONS-PLAN SET BELLINGHAM_V3_V3.PDF DOCUMENTS VIEW
CONS-CONS-CONS-PLAN SET BELLINGHAM_V3_V3.PDF DOCUMENTS VIEW