Permit: TC-RES-1222-01229
Permit Details
Apply Date:
12/01/2022
Applicant:
Hector Rubio
Description:
NEW SFR
Permit Reviews
Permit Number - TC-RES-1222-01229
Permit Status: Issued
Permit Description: NEW SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/20/2023 | RESIDENTIAL NEW DWELLING v.3 | 11/08/2023 | APPROVED |
09/13/2023 | RESIDENTIAL NEW DWELLING v.2 | 10/09/2023 | REQUIRES RESUBMIT |
11/08/2023 | RESTAMP - RESIDENTIAL v.1 | 11/13/2023 | APPROVED |
01/27/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/30/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1222-01229
Permit Status: Issued
Permit Description: NEW SFR
Date | Description | Comments |
---|---|---|
11/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
01/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-1222-01229
Permite Description: NEW SFR
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | No sweep or riser with weather head installed on electrical panel. No access to building to verify Ufer ground is properly connected. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-1222-01229
Permit Description: NEW SFR
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/09/2024 | COT - RSPL - Rough Soil | Passed | 2/9/24: okay to back fill underground plumbing needs inspection for sewer connection | |
04/05/2024 | COT - RSBU - Preslab | Passed | 4/5/24: Setback is 10' from property line on north side of lot. Concrete forms are in place, footings are dug per plans, rebar reinforcement is installed per plans, and 20' piece of rebar is bent and connected to the bottom rebar reinforcement of footing for a Ufer ground. Okay to proceed with concrete pour. | |
04/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 4/5/24: Setback is 10' from property line on north side of lot. Concrete forms are in place, footings are dug per plans, rebar reinforcement is installed per plans, and 20' piece of rebar is bent and connected to the bottom rebar reinforcement of footing for a Ufer ground. Okay to proceed with concrete pour. | |
04/05/2024 | COT - RSEL - Grounding/Bonding | Passed | 4/5/24: Setback is 10' from property line on north side of lot. Concrete forms are in place, footings are dug per plans, rebar reinforcement is installed per plans, and 20' piece of rebar is bent and connected to the bottom rebar reinforcement of footing for a Ufer ground. Okay to proceed with concrete pour. | |
06/26/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical. | |
06/26/2024 | RSBU - Building Progress | Passed | Base plates are secured to concrete floor with shot pins, poured in place bolts or titan bolts. Plywood sheathing is properly secured to studs per plan requirements for shear walls. Okay to proceed with dry-in for stucco work. Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical. | |
06/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Base plates are secured to concrete floor with shot pins, poured in place bolts or titan bolts. Plywood sheathing is properly secured to studs per plan requirements for shear walls. Okay to proceed with dry-in for stucco work. | |
07/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. |
Scheduled Inspections
Scheduled Inspections - TC-RES-1222-01229
Status: Issued
Description: NEW SFR
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/20/2024 | BULD - Electrical Clearance | Scheduled |